Hunts Cross
HNXNorth WestManaged by Merseyrail
How this station is performing
Hunts Cross had 56,369 scheduled stops to Period 7 of 2026-27, about 155 a day. 89.1% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Hunts Cross opened on 1 May 1874, 152 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Liverpool South Parkway is the oldest (1864) and West Allerton the newest (1939), with Hunts Cross in between.
The nearest stations to Hunts Cross are Halewood (1.7 km east), Liverpool South Parkway (2.3 km west), West Allerton (3.5 km west), Cressington (3.7 km west) and Mossley Hill (4.4 km north-west). 31 stations lie within 10 km in all. Of the five, Cressington is the most punctual at 91.5% and West Allerton the least at 75.3%, with Hunts Cross on 89.1%.
Hunts Cross is named after Hunt's Cross, a suburb, but the station stands 0.1 km from its centre.
4 operators call at Hunts Cross: Merseyrail (93.4%, 77% of stops), Northern (75.7%, 23% of stops), East Midlands Railway (–, 1% of stops) and TransPennine Express (–, 0% of stops). The operator you travel with matters: Merseyrail reaches 93.4% within three minutes while Northern manages 75.7%, a gap of 17.7 percentage points.
Compared with 3 stations of a similar size in North West, Hunts Cross is the most punctual, at 89.1%. The comparison group includes Wilmslow (72.6%), Deansgate (59.6%) and Blackburn (76.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 43,311 | 93.4% | 2.1% |
| Northern | 12,758 | 75.7% | 3.3% |
| East Midlands Railway | 299 | – | – |
| TransPennine Express | 1 | – | – |
Operators with their own page for this station are linked to it.
Late train at Hunts Cross? Delay Repay
These operators call at Hunts Cross and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,518 | 89.8% | 2.3% |
| Period 6 of 2026-27 | 4,365 | 90.6% | 1.9% |
| Period 5 of 2026-27 | 4,371 | 88.5% | 2.4% |
| Period 4 of 2026-27 | 4,295 | 88.6% | 2.6% |
| Period 3 of 2026-27 | 4,197 | 91.4% | 2.4% |
| Period 2 of 2026-27 | 4,376 | 91.0% | 1.7% |
| Period 1 of 2026-27 | 5,069 | 90.4% | 2.8% |
| Period 13 of 2025-26 | 4,795 | 91.8% | 2.0% |
| Period 12 of 2025-26 | 4,365 | 90.6% | 1.3% |
| Period 11 of 2025-26 | 4,370 | 89.1% | 2.4% |
| Period 10 of 2025-26 | 3,922 | 87.7% | 3.0% |
| Period 9 of 2025-26 | 4,358 | 84.8% | 4.2% |
| Period 8 of 2025-26 | 4,368 | 83.5% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out