Northern at Deansgate
How this operator is doing here
Northern had 58,121 scheduled stops at Deansgate in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 59.6% of recorded arrivals came within three minutes and 3.7% of stops were cancelled.
Northern trains at Deansgate also serve Manchester Oxford Road (0.6 km east, 56.2% on time, 3.3% cancelled), Salford Central (1.0 km north, 78.5% on time, 3.0% cancelled), Manchester Piccadilly (1.4 km east, 75.9% on time, 2.7% cancelled), Manchester Victoria (1.6 km north, 74.1% on time, 2.9% cancelled), Salford Crescent (2.1 km north-west, 74.3% on time, 3.4% cancelled) and Ardwick (2.5 km east, – on time, – cancelled), which are the stations on its network closest to Deansgate.
Within 30 km of here, Northern runs best at Rose Hill Marple, 14.4 km south-east (93.3%), and worst at Moses Gate, 13.5 km north-west (52.6%).
The busiest Northern station within 30 km of Deansgate is Manchester Piccadilly, 1.4 km east, with about 508 scheduled stops a day.
Northern at Deansgate has slipped a little, from 64.0% within three minutes in the previous 13 periods to 59.6% in the latest 13, a fall of 4.4 percentage points. Cancellations fell to 3.7% of scheduled stops from 5.6%, which is 1.9 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,479 | 59.5% | 2.9% |
| Period 6 of 2026-27 | 4,522 | 60.7% | 2.7% |
| Period 5 of 2026-27 | 4,500 | 62.1% | 5.5% |
| Period 4 of 2026-27 | 4,496 | 60.4% | 3.6% |
| Period 3 of 2026-27 | 4,244 | 57.0% | 4.1% |
| Period 2 of 2026-27 | 4,524 | 64.1% | 2.8% |
| Period 1 of 2026-27 | 5,010 | 62.8% | 2.5% |
| Period 13 of 2025-26 | 4,929 | 63.2% | 5.8% |
| Period 12 of 2025-26 | 4,567 | 65.8% | 2.8% |
| Period 11 of 2025-26 | 4,508 | 60.6% | 2.1% |
| Period 10 of 2025-26 | 3,832 | 57.3% | 6.2% |
| Period 9 of 2025-26 | 4,092 | 44.7% | 3.5% |
| Period 8 of 2025-26 | 4,418 | 54.3% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Deansgate
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 1 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out