Deal
DEASouth EastManaged by Southeastern
How this station is performing
Deal had 15,835 scheduled stops to Period 7 of 2026-27, about 44 a day. 77.2% of recorded arrivals were within three minutes of the timetable and 1.2% of scheduled stops were cancelled.
Deal opened on 1 July 1847, 179 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Deal is the oldest; the next oldest, Sandwich, dates from 1847.
The nearest stations to Deal are Walmer (2.5 km south-west), Sandwich (6.5 km north-west), Martin Mill (6.8 km south-west), Kearsney (Kent) (12.1 km south-west) and Thanet Parkway (12.2 km north). 3 stations lie within 10 km in all. Of the five, Walmer is the most punctual at 78.1% and Kearsney (Kent) the least at 75.7%, with Deal on 77.2%.
Deal takes its name from a town called Deal, home to about 20,823 people, and the station stands 0.1 km from its centre.
For Deal, the weakest four-week period in the data is a recent one: Period 8 of 2025-26, when only 66.1% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 86.9%, which is 20.8 percentage points higher. Cancellations peaked at 7.0% of scheduled stops in Period 12 of 2023-24, against 1.2% over the latest 13 periods.
2 of 3 stations of a similar size in South East are more punctual than Deal on 77.2%. The comparison group includes Crowthorne (84.9%), Shawford (78.9%) and Bosham (71.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 15,835 | 77.2% | 1.2% |
Operators with their own page for this station are linked to it.
Late train at Deal? Delay Repay
These operators call at Deal and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,190 | 74.9% | 1.2% |
| Period 6 of 2026-27 | 1,205 | 75.2% | 0.9% |
| Period 5 of 2026-27 | 1,216 | 75.6% | 0.8% |
| Period 4 of 2026-27 | 1,219 | 78.3% | 1.9% |
| Period 3 of 2026-27 | 1,220 | 70.4% | 1.2% |
| Period 2 of 2026-27 | 1,198 | 77.2% | 1.2% |
| Period 1 of 2026-27 | 1,385 | 85.2% | 0.4% |
| Period 13 of 2025-26 | 1,314 | 84.3% | 2.8% |
| Period 12 of 2025-26 | 1,221 | 81.5% | 0.6% |
| Period 11 of 2025-26 | 1,218 | 81.8% | 0.8% |
| Period 10 of 2025-26 | 1,011 | 76.4% | 1.0% |
| Period 9 of 2025-26 | 1,219 | 74.8% | 1.5% |
| Period 8 of 2025-26 | 1,219 | 66.1% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Crowthorne | 15,823 | 84.9% | 6.0% |
| Shawford | 15,806 | 78.9% | 4.3% |
| Bosham | 15,781 | 71.6% | 6.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out