Crowthorne
CRNSouth EastManaged by Great Western Railway
How this station is performing
Crowthorne had 15,823 scheduled stops to Period 7 of 2026-27, about 44 a day. 84.9% of recorded arrivals were within three minutes of the timetable and 6.0% of scheduled stops were cancelled.
Crowthorne opened on 29 January 1859, 167 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Blackwater is the oldest (1849) and Camberley the newest (1878), with Crowthorne in between.
The nearest stations to Crowthorne are Sandhurst (Berks) (2.5 km south-east), Blackwater (4.8 km south-east), Wokingham (5.3 km north), Camberley (6.2 km south-east) and Bracknell (7.0 km north-east). 13 stations lie within 10 km in all. Of the five, Camberley is the most punctual at 95.9% and Sandhurst (Berks) the least at 82.2%, with Crowthorne on 84.9%.
Crowthorne takes its name from a town called Crowthorne, home to about 7,810 people, and the station stands 1.9 km from its centre.
Cancellations are a particular problem at Crowthorne. 6.0% of scheduled stops did not happen, 2.2 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2247th of 2,374.
Compared with 3 stations of a similar size in South East, Crowthorne is the most punctual, at 84.9%. The comparison group includes Deal (77.2%), Shawford (78.9%) and Bosham (71.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 15,823 | 84.9% | 6.0% |
Operators with their own page for this station are linked to it.
Late train at Crowthorne? Delay Repay
These operators call at Crowthorne and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,224 | 78.6% | 3.6% |
| Period 6 of 2026-27 | 1,225 | 78.2% | 7.9% |
| Period 5 of 2026-27 | 1,224 | 80.6% | 7.4% |
| Period 4 of 2026-27 | 1,224 | 80.8% | 8.9% |
| Period 3 of 2026-27 | 1,196 | 86.0% | 8.1% |
| Period 2 of 2026-27 | 1,188 | 89.3% | 4.5% |
| Period 1 of 2026-27 | 1,404 | 86.9% | 4.1% |
| Period 13 of 2025-26 | 1,321 | 90.7% | 3.3% |
| Period 12 of 2025-26 | 1,193 | 91.0% | 5.0% |
| Period 11 of 2025-26 | 1,226 | 89.5% | 5.1% |
| Period 10 of 2025-26 | 1,090 | 83.0% | 8.5% |
| Period 9 of 2025-26 | 1,127 | 87.5% | 5.2% |
| Period 8 of 2025-26 | 1,181 | 83.3% | 7.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out