Southeastern at Dartford
How this operator is doing here
Southeastern had 118,506 scheduled stops at Dartford in the 13 periods to Period 7 of 2026-27, 82% of the station's total. 83.2% of recorded arrivals came within three minutes and 1.3% of stops were cancelled.
Southeastern trains at Dartford also serve Crayford (2.8 km west, 88.4% on time, 1.4% cancelled), Slade Green (3.0 km north-west, 90.8% on time, 1.6% cancelled), Stone Crossing (3.1 km east, 86.6% on time, 1.8% cancelled), Greenhithe for Bluewater (4.2 km east, 82.0% on time, 3.0% cancelled), Barnehurst (4.6 km north-west, 85.8% on time, 2.0% cancelled) and Erith (4.9 km north-west, 92.2% on time, 1.6% cancelled), which are the stations on its network closest to Dartford.
Within 30 km of here, Southeastern runs best at Sundridge Park, 14.2 km west (99.4%), and worst at Hildenborough, 25.9 km south (70.3%).
The busiest Southeastern station within 30 km of Dartford is London Bridge, 22.0 km west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Dartford, Southeastern is the most punctual, at 83.2%.
For Southeastern, Dartford is the 84th best of 173 ranked stations. Its 83.2% here is 1.0 percentage points below the 84.2% across the whole network.
Cancellations of Southeastern at Dartford are near its usual level: 1.3% of scheduled stops, against 1.7% across its network and 2.0% for every operator at the station.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 9,337 | 83.2% | 0.8% |
| Period 6 of 2026-27 | 9,248 | 82.6% | 0.9% |
| Period 5 of 2026-27 | 8,707 | 82.9% | 2.3% |
| Period 4 of 2026-27 | 9,329 | 86.3% | 1.2% |
| Period 3 of 2026-27 | 9,684 | 79.2% | 2.4% |
| Period 2 of 2026-27 | 9,487 | 81.5% | 3.2% |
| Period 1 of 2026-27 | 10,916 | 86.9% | 1.1% |
| Period 13 of 2025-26 | 9,958 | 85.4% | 0.9% |
| Period 12 of 2025-26 | 6,102 | 81.1% | 0.8% |
| Period 11 of 2025-26 | 9,293 | 83.9% | 0.9% |
| Period 10 of 2025-26 | 7,969 | 86.5% | 1.0% |
| Period 9 of 2025-26 | 9,227 | 81.3% | 0.9% |
| Period 8 of 2025-26 | 9,249 | 80.2% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dartford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 26,214 | 78.2% | 5.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out