GTR had 26,214 scheduled stops at Dartford in the 13 periods to Period 7 of 2026-27, 18% of the station's total. 78.2% of recorded arrivals came within three minutes and 5.0% of stops were cancelled.
GTR trains at Dartford also serve Slade Green (3.0 km north-west, 84.9% on time, 6.4% cancelled), Stone Crossing (3.1 km east, 82.6% on time, 5.1% cancelled), Greenhithe for Bluewater (4.2 km east, 83.4% on time, 5.1% cancelled), Barnehurst (4.6 km north-west, 88.7% on time, 1.3% cancelled), Bexleyheath (6.2 km west, 90.0% on time, 1.3% cancelled) and Swanscombe (6.4 km east, 83.3% on time, 5.1% cancelled), which are the stations on its network closest to Dartford.
Within 30 km of here, GTR runs best at Beckenham Junction, 17.5 km west (98.1%), and worst at Kenley, 26.1 km south-west (66.9%).
The busiest GTR station within 30 km of Dartford is East Croydon, 23.1 km west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Dartford, GTR is the least punctual, at 78.2%.
For GTR, Dartford is the 226th best of 307 ranked stations. Its 78.2% here is 4.7 percentage points below the 82.9% across the whole network.
Over three full railway years GTR at Dartford has got worse each time, from 86.0% within three minutes in 2023-24 to 80.6% in 2024-25 and 80.4% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,159 | 77.2% | 4.5% |
| Period 6 of 2026-27 | 1,969 | 74.9% | 4.2% |
| Period 5 of 2026-27 | 1,651 | 78.5% | 6.0% |
| Period 4 of 2026-27 | 1,963 | 79.5% | 3.3% |
| Period 3 of 2026-27 | 2,028 | 75.8% | 4.2% |
| Period 2 of 2026-27 | 2,110 | 77.9% | 4.6% |
| Period 1 of 2026-27 | 2,328 | 82.5% | 3.6% |
| Period 13 of 2025-26 | 2,317 | 82.1% | 2.1% |
| Period 12 of 2025-26 | 1,348 | 74.7% | 5.9% |
| Period 11 of 2025-26 | 2,090 | 79.2% | 5.6% |
| Period 10 of 2025-26 | 1,981 | 83.0% | 9.0% |
| Period 9 of 2025-26 | 2,114 | 74.4% | 8.8% |
| Period 8 of 2025-26 | 2,156 | 74.6% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dartford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 118,506 | 83.2% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out