ScotRail had 114,126 scheduled stops at Dalmuir in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 85.3% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.
ScotRail trains at Dalmuir also serve Singer (1.4 km east, 84.9% on time, 2.1% cancelled), Clydebank (1.9 km south-east, 86.8% on time, 2.4% cancelled), Kilpatrick (2.1 km north-west, 83.3% on time, 1.9% cancelled), Drumry (2.7 km east, 85.6% on time, 2.1% cancelled), Yoker (3.2 km south-east, 87.8% on time, 2.5% cancelled) and Drumchapel (4.1 km east, 87.7% on time, 2.1% cancelled), which are the stations on its network closest to Dalmuir.
Within 30 km of here, ScotRail runs best at Neilston, 14.3 km south (97.6%), and worst at Helensburgh Upper, 22.0 km north-west (58.2%).
The busiest ScotRail station within 30 km of Dalmuir is Glasgow Central, 12.1 km south-east, with about 995 scheduled stops a day.
Of the 1 operators with enough records at Dalmuir, ScotRail is the most punctual, at 85.3%.
For ScotRail, Dalmuir is the 207th best of 312 ranked stations. Its 85.3% here is 2.6 percentage points below the 87.9% across the whole network.
Over three full railway years ScotRail at Dalmuir has got worse each time, from 87.1% within three minutes in 2023-24 to 86.3% in 2024-25 and 85.2% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 8,693 | 82.9% | 1.8% |
| Period 6 of 2026-27 | 8,696 | 87.8% | 1.2% |
| Period 5 of 2026-27 | 8,700 | 87.2% | 1.6% |
| Period 4 of 2026-27 | 8,693 | 87.7% | 3.7% |
| Period 3 of 2026-27 | 8,696 | 88.9% | 1.2% |
| Period 2 of 2026-27 | 8,684 | 86.8% | 1.0% |
| Period 1 of 2026-27 | 10,019 | 88.4% | 1.3% |
| Period 13 of 2025-26 | 9,476 | 87.5% | 1.2% |
| Period 12 of 2025-26 | 8,688 | 86.8% | 1.5% |
| Period 11 of 2025-26 | 8,685 | 86.3% | 1.7% |
| Period 10 of 2025-26 | 7,736 | 82.9% | 2.1% |
| Period 9 of 2025-26 | 8,685 | 76.9% | 3.6% |
| Period 8 of 2025-26 | 8,675 | 77.1% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Dalmuir