Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

TransPennine Express at Crowle

All trains at CrowleTransPennine Express across BritainYorkshire and The Humber

On time, last 13 periods62.5%Whole station: 84.1%
Cancelled0.0%Whole station: 1.5%
Scheduled stops613Of 5,649 at the station

How this operator is doing here

TransPennine Express had 613 scheduled stops at Crowle in the 13 periods to Period 7 of 2026-27, 11% of the station's total. 62.5% of recorded arrivals came within three minutes and 0.0% of stops were cancelled.

TransPennine Express trains at Crowle also serve Althorpe (5.6 km east, 57.1% on time, 0.0% cancelled), Thorne South (9.2 km west, 60.7% on time, 0.0% cancelled), Scunthorpe (11.0 km east, 70.4% on time, 2.8% cancelled), Hatfield and Stainforth (13.6 km west, 62.5% on time, 0.0% cancelled), Kirk Sandall (17.3 km west, – on time, – cancelled) and Gilberdyke (18.5 km north, – on time, – cancelled), which are the stations on its network closest to Crowle.

Within 30 km of here, TransPennine Express runs best at Brough, 21.9 km north-east (79.2%), and worst at Doncaster, 22.6 km west (67.9%).

The busiest TransPennine Express station within 30 km of Crowle is Selby, 26.9 km north-west, with about 36 scheduled stops a day.

Of the 2 operators with enough records at Crowle, TransPennine Express is the least punctual, at 62.5%.

TransPennine Express cancels fewer trains at Crowle than elsewhere: 0.0% of scheduled stops, against 3.3% across its network and 1.5% for every operator at the station.

Period by period

60%70%80%90%2023-242024-252025-262026-27Period 1 of 2026-27: 62.5%
This pageGreat Britain
0%2%4%Period 1 of 2026-27: 0.0%2023-242024-252025-262026-27

See how TransPennine Express Delay Repay works

The last 13 periods

Other operators at Crowle

OperatorScheduled stopsWithin 3 minCancelled
Northern5,03687.2%1.3%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out