Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Croston

CSONorth WestManaged by Northern Trains

On time, last 13 periods88.4%Great Britain: 83.6%
Cancelled4.0%Great Britain: 3.2%
Stops a day29Scheduled, on average
Punctuality rank691st of 2,374Among ranked stations

How this station is performing

Croston has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 10,638 scheduled stops, about 29 a day. In those periods 88.4% of stops arrived within three minutes of the timetable and 4.0% of scheduled stops were cancelled.

Croston opened on 2 April 1849, 177 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Leyland is the oldest (1838) and Buckshaw Parkway the newest (2011), with Croston in between.

The nearest stations to Croston are Rufford (4.2 km south-west), Leyland (6.9 km north-east), Euxton Balshaw Lane (7.0 km east), Buckshaw Parkway (7.8 km east) and Hoscar (8.0 km south). 10 stations lie within 10 km in all. Of the five, Rufford is the most punctual at 89.5% and Buckshaw Parkway the least at 59.8%, with Croston on 88.4%.

Croston takes its name from a Village called Croston, home to about 3,099 people, and the station stands 0.6 km from its centre.

2 of 3 stations of a similar size in North West are more punctual than Croston on 88.4%. The comparison group includes Burscough Junction (89.4%), Rufford (89.5%) and Burneside (Cumbria) (85.8%).

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 96.8%Period 2 of 2023-24: 95.0%Period 3 of 2023-24: 92.9%Period 4 of 2023-24: 95.3%Period 5 of 2023-24: 93.1%Period 6 of 2023-24: 92.4%Period 7 of 2023-24: 87.8%Period 8 of 2023-24: 84.7%Period 9 of 2023-24: 80.1%Period 10 of 2023-24: 90.1%Period 11 of 2023-24: 96.8%Period 12 of 2023-24: 94.3%Period 13 of 2023-24: 95.8%Period 1 of 2024-25: 93.9%Period 2 of 2024-25: 90.7%Period 3 of 2024-25: 94.9%Period 4 of 2024-25: 93.9%Period 5 of 2024-25: 91.6%Period 6 of 2024-25: 89.5%Period 7 of 2024-25: 86.8%Period 8 of 2024-25: 80.9%Period 9 of 2024-25: 83.0%Period 11 of 2024-25: 87.6%Period 12 of 2024-25: 93.8%Period 13 of 2024-25: 97.3%Period 1 of 2025-26: 94.4%Period 2 of 2025-26: 89.0%Period 3 of 2025-26: 93.3%Period 5 of 2025-26: 90.2%Period 6 of 2025-26: 94.0%Period 7 of 2025-26: 89.5%Period 8 of 2025-26: 77.4%Period 9 of 2025-26: 84.2%Period 10 of 2025-26: 91.3%Period 11 of 2025-26: 93.7%Period 12 of 2025-26: 92.3%Period 13 of 2025-26: 92.9%Period 2 of 2026-27: 90.7%Period 3 of 2026-27: 86.7%Period 4 of 2026-27: 89.3%Period 5 of 2026-27: 87.9%Period 6 of 2026-27: 91.0%Period 7 of 2026-27: 84.2%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 2.1%Period 2 of 2023-24: 3.8%Period 3 of 2023-24: 6.0%Period 4 of 2023-24: 5.6%Period 5 of 2023-24: 5.9%Period 6 of 2023-24: 6.2%Period 7 of 2023-24: 5.4%Period 8 of 2023-24: 5.1%Period 9 of 2023-24: 10.2%Period 10 of 2023-24: 9.9%Period 11 of 2023-24: 4.6%Period 12 of 2023-24: 3.4%Period 13 of 2023-24: 4.2%Period 1 of 2024-25: 3.3%Period 2 of 2024-25: 5.4%Period 3 of 2024-25: 5.3%Period 4 of 2024-25: 5.9%Period 5 of 2024-25: 6.0%Period 6 of 2024-25: 5.4%Period 7 of 2024-25: 4.9%Period 8 of 2024-25: 6.7%Period 9 of 2024-25: 7.6%Period 10 of 2024-25: 6.0%Period 11 of 2024-25: 5.9%Period 12 of 2024-25: 2.0%Period 13 of 2024-25: 1.9%Period 1 of 2025-26: 2.5%Period 2 of 2025-26: 4.5%Period 3 of 2025-26: 2.9%Period 4 of 2025-26: 3.7%Period 5 of 2025-26: 4.9%Period 6 of 2025-26: 2.7%Period 7 of 2025-26: 3.7%Period 8 of 2025-26: 3.9%Period 9 of 2025-26: 6.0%Period 10 of 2025-26: 5.0%Period 11 of 2025-26: 2.0%Period 12 of 2025-26: 2.2%Period 13 of 2025-26: 2.8%Period 1 of 2026-27: 4.1%Period 2 of 2026-27: 3.9%Period 3 of 2026-27: 5.1%Period 4 of 2026-27: 2.7%Period 5 of 2026-27: 6.4%Period 6 of 2026-27: 2.7%Period 7 of 2026-27: 4.9%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
Northern10,63888.4%4.0%

Operators with their own page for this station are linked to it.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2781684.2%4.9%
Period 6 of 2026-2781691.0%2.7%
Period 5 of 2026-2781687.9%6.4%
Period 4 of 2026-2781689.3%2.7%
Period 3 of 2026-2781686.7%5.1%
Period 2 of 2026-2781690.7%3.9%
Period 1 of 2026-27956–4.1%
Period 13 of 2025-2688492.9%2.8%
Period 12 of 2025-2681692.3%2.2%
Period 11 of 2025-2681693.7%2.0%
Period 10 of 2025-2663891.3%5.0%
Period 9 of 2025-2681684.2%6.0%
Period 8 of 2025-2681677.4%3.9%

Time of year

80%90%100%P1: 95.2%1P2: 91.4%2P3: 91.9%3P4: 92.8%4P5: 90.4%5P6: 91.8%6P7: 87.2%7P8: 80.6%8P9: 82.8%9P10: 90.7%10P11: 92.7%11P12: 93.5%12P13: 95.1%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Similar stations in North West

StationScheduled stopsWithin 3 minCancelled
Burscough Junction10,63889.4%4.0%
Rufford10,63889.5%4.0%
Burneside (Cumbria)10,93285.8%2.3%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out