Southeastern at Crofton Park
How this operator is doing here
Southeastern had 1,500 scheduled stops at Crofton Park in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 83.4% of recorded arrivals came within three minutes and 2.8% of stops were cancelled.
Southeastern trains at Crofton Park also serve Ladywell (1.2 km east, 93.0% on time, 1.1% cancelled), Catford Bridge (1.4 km south-east, 93.1% on time, 1.1% cancelled), Nunhead (1.7 km north-west, 86.1% on time, 2.2% cancelled), St Johns (London) (1.9 km north-east, 91.9% on time, 1.5% cancelled), Lewisham (2.0 km north-east, 87.0% on time, 1.5% cancelled) and New Cross (2.4 km north, 90.1% on time, 1.5% cancelled), which are the stations on its network closest to Crofton Park.
Within 30 km of here, Southeastern runs best at Sundridge Park, 6.1 km south-east (99.4%), and worst at Sevenoaks, 25.0 km south-east (72.3%).
The busiest Southeastern station within 30 km of Crofton Park is London Bridge, 6.5 km north-west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Crofton Park, Southeastern is the least punctual, at 83.4%.
For Southeastern, Crofton Park is the 81st best of 173 ranked stations. Its 83.4% here is 0.8 percentage points below the 84.2% across the whole network.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 120 | 78.2% | 0.8% |
| Period 6 of 2026-27 | 114 | 80.0% | 3.5% |
| Period 5 of 2026-27 | 120 | 81.7% | 0.0% |
| Period 4 of 2026-27 | 120 | 89.8% | 1.7% |
| Period 3 of 2026-27 | 120 | 83.3% | 4.2% |
| Period 2 of 2026-27 | 108 | 86.7% | 13.9% |
| Period 1 of 2026-27 | 126 | 96.8% | 0.8% |
| Period 13 of 2025-26 | 132 | 89.9% | 2.3% |
| Period 12 of 2025-26 | 120 | 90.0% | 0.0% |
| Period 11 of 2025-26 | 120 | 89.9% | 0.8% |
| Period 10 of 2025-26 | 60 | 78.0% | 1.7% |
| Period 9 of 2025-26 | 120 | 62.7% | 1.7% |
| Period 8 of 2025-26 | 120 | 72.6% | 5.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Crofton Park
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 32,761 | 92.0% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out