Crofton Park
CFTLondonManaged by Govia Thameslink Railway (Thameslink)
How this station is performing
Crofton Park had 34,261 scheduled stops to Period 7 of 2026-27, about 94 a day. 91.6% of recorded arrivals were within three minutes of the timetable and 4.0% of scheduled stops were cancelled.
Crofton Park opened on 1 July 1892, 134 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Crofton Park is the newest; the oldest, Ladywell, opened in 1857.
The nearest stations to Crofton Park are Honor Oak Park (0.8 km south-west), Brockley (1.1 km north), Ladywell (1.2 km east), Catford (1.4 km south-east) and Catford Bridge (1.4 km south-east). 122 stations lie within 10 km in all. Of the five, Catford Bridge is the most punctual at 93.1% and Catford the least at 90.8%, with Crofton Park on 91.6%.
Crofton Park takes its name from an area of London called Crofton Park, home to about 14,937 people, and the station stands 0.4 km from its centre.
2 operators call at Crofton Park: GTR (92.0%, 96% of stops) and Southeastern (83.4%, 4% of stops). The operator you travel with matters: GTR reaches 92.0% within three minutes while Southeastern manages 83.4%, a gap of 8.6 percentage points.
1 of 3 stations of a similar size in London are more punctual than Crofton Park on 91.6%. The comparison group includes Bellingham (88.9%), Crews Hill (91.9%) and Kew Bridge (89.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 32,761 | 92.0% | 4.1% |
| Southeastern | 1,500 | 83.4% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Crofton Park? Delay Repay
These operators call at Crofton Park and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,681 | 90.1% | 2.5% |
| Period 6 of 2026-27 | 2,682 | 88.7% | 4.5% |
| Period 5 of 2026-27 | 2,744 | 90.4% | 3.6% |
| Period 4 of 2026-27 | 2,740 | 91.9% | 3.9% |
| Period 3 of 2026-27 | 2,495 | 91.9% | 5.4% |
| Period 2 of 2026-27 | 2,419 | 94.6% | 7.2% |
| Period 1 of 2026-27 | 3,003 | 95.9% | 1.3% |
| Period 13 of 2025-26 | 2,925 | 94.2% | 3.2% |
| Period 12 of 2025-26 | 2,680 | 93.6% | 2.6% |
| Period 11 of 2025-26 | 2,716 | 92.9% | 2.7% |
| Period 10 of 2025-26 | 1,822 | 90.4% | 6.5% |
| Period 9 of 2025-26 | 2,748 | 86.9% | 6.4% |
| Period 8 of 2025-26 | 2,606 | 89.0% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bellingham | 34,631 | 88.9% | 4.0% |
| Crews Hill | 33,817 | 91.9% | 4.6% |
| Kew Bridge | 33,711 | 89.8% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out