Kew Bridge
KWBLondonManaged by South Western Railway
How this station is performing
Kew Bridge had 33,711 scheduled stops to Period 7 of 2026-27, about 93 a day. 89.8% of recorded arrivals were within three minutes of the timetable and 3.5% of scheduled stops were cancelled.
Kew Bridge opened on 22 August 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Kew Bridge is the oldest; the next oldest, Brentford, dates from 1849.
The nearest stations to Kew Bridge are Gunnersbury (0.8 km east), Kew Gardens (1.3 km south), Brentford (1.5 km west), Chiswick (1.6 km south-east) and South Acton (1.7 km north-east). 74 stations lie within 10 km in all. At 89.8%, Kew Bridge is more punctual than every one of them; the best of the five, Chiswick, manages 87.6%.
Kew Bridge is named after Kew, an area of London, but the station stands 0.9 km from its centre.
Across the whole run of data, the weakest four-week period for Kew Bridge was Period 9 of 2024-25, at 74.2%, some time before the latest year. The strongest was Period 1 of 2026-27, at 93.5%, and the two are 19.3 percentage points apart. Cancellations peaked at 7.3% of scheduled stops in Period 4 of 2025-26, against 3.5% over the latest 13 periods.
1 of 3 stations of a similar size in London are more punctual than Kew Bridge on 89.8%. The comparison group includes Brentford (86.8%), Crews Hill (91.9%) and Isleworth (89.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 33,711 | 89.8% | 3.5% |
Operators with their own page for this station are linked to it.
Late train at Kew Bridge? Delay Repay
These operators call at Kew Bridge and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,663 | 90.2% | 2.2% |
| Period 6 of 2026-27 | 2,623 | 90.6% | 2.5% |
| Period 5 of 2026-27 | 2,461 | 89.4% | 4.3% |
| Period 4 of 2026-27 | 2,537 | 87.9% | 3.1% |
| Period 3 of 2026-27 | 2,441 | 89.2% | 3.5% |
| Period 2 of 2026-27 | 2,502 | 89.4% | 7.0% |
| Period 1 of 2026-27 | 3,028 | 93.5% | 3.0% |
| Period 13 of 2025-26 | 2,881 | 93.1% | 1.7% |
| Period 12 of 2025-26 | 2,607 | 93.1% | 5.6% |
| Period 11 of 2025-26 | 2,616 | 91.1% | 2.4% |
| Period 10 of 2025-26 | 2,166 | 89.5% | 3.4% |
| Period 9 of 2025-26 | 2,620 | 84.8% | 2.3% |
| Period 8 of 2025-26 | 2,566 | 83.7% | 4.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in London
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Brentford | 33,652 | 86.8% | 3.5% |
| Crews Hill | 33,817 | 91.9% | 4.6% |
| Isleworth | 33,599 | 89.5% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out