Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

TransPennine Express at Cottingley

All trains at CottingleyTransPennine Express across BritainYorkshire and The Humber

On time, last 13 periods76.2%Whole station: 73.4%
Cancelled2.4%Whole station: 1.9%
Scheduled stops685Of 11,711 at the station

How this operator is doing here

TransPennine Express had 685 scheduled stops at Cottingley in the 13 periods to Period 7 of 2026-27, 6% of the station's total. 76.2% of recorded arrivals came within three minutes and 2.4% of stops were cancelled.

TransPennine Express trains at Cottingley also serve Morley (1.9 km south, 76.4% on time, 2.0% cancelled), Leeds (3.9 km north-east, 68.0% on time, 2.0% cancelled), Batley (6.8 km south, 75.8% on time, 2.0% cancelled), Dewsbury (9.0 km south, 66.1% on time, 2.4% cancelled), Cross Gates (9.9 km north-east, 84.2% on time, 0.4% cancelled) and Ravensthorpe (11.2 km south-west, – on time, – cancelled), which are the stations on its network closest to Cottingley.

Within 30 km of here, TransPennine Express runs best at Castleford, 16.1 km east (73.6%), and worst at Huddersfield, 18.6 km south-west (61.3%).

The busiest TransPennine Express station within 30 km of Cottingley is Leeds, 3.9 km north-east, with about 141 scheduled stops a day.

Of the 2 operators with enough records at Cottingley, TransPennine Express is the most punctual, at 76.2%.

Cancellations of TransPennine Express at Cottingley are near its usual level: 2.4% of scheduled stops, against 3.3% across its network and 1.9% for every operator at the station.

Alongside TransPennine Express, the other operators at Cottingley are Northern (73.7%, 94% of stops), so passengers here can compare several services.

Period by period

40%60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 73.9%Period 2 of 2023-24: 66.8%Period 3 of 2023-24: 65.2%Period 4 of 2023-24: 66.8%Period 5 of 2023-24: 64.5%Period 6 of 2023-24: 60.5%Period 7 of 2023-24: 61.0%Period 8 of 2023-24: 56.0%Period 9 of 2023-24: 44.1%Period 10 of 2023-24: 56.5%Period 11 of 2023-24: 60.9%Period 12 of 2023-24: 64.9%Period 13 of 2023-24: 67.8%Period 1 of 2024-25: 60.8%Period 2 of 2024-25: 60.2%Period 3 of 2024-25: 61.6%Period 4 of 2024-25: 63.4%Period 5 of 2024-25: 59.4%Period 6 of 2024-25: 56.4%Period 7 of 2024-25: 53.7%Period 8 of 2024-25: 52.4%Period 9 of 2024-25: 42.6%Period 10 of 2024-25: 54.6%Period 11 of 2024-25: 45.3%Period 12 of 2024-25: 49.5%Period 13 of 2024-25: 58.6%Period 1 of 2025-26: 60.3%Period 2 of 2025-26: 62.5%Period 3 of 2025-26: 76.6%Period 4 of 2025-26: 56.7%Period 5 of 2025-26: 70.3%Period 6 of 2025-26: 66.5%Period 10 of 2025-26: 70.7%Period 2 of 2026-27: 58.5%Period 5 of 2026-27: 78.9%Period 6 of 2026-27: 81.3%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.9%Period 2 of 2023-24: 3.0%Period 3 of 2023-24: 5.4%Period 4 of 2023-24: 3.2%Period 5 of 2023-24: 4.9%Period 6 of 2023-24: 1.5%Period 7 of 2023-24: 1.9%Period 8 of 2023-24: 3.4%Period 9 of 2023-24: 5.1%Period 10 of 2023-24: 1.6%Period 11 of 2023-24: 2.5%Period 12 of 2023-24: 0.6%Period 13 of 2023-24: 0.6%Period 1 of 2024-25: 1.9%Period 2 of 2024-25: 0.3%Period 3 of 2024-25: 1.5%Period 4 of 2024-25: 5.1%Period 5 of 2024-25: 2.3%Period 6 of 2024-25: 3.4%Period 7 of 2024-25: 0.9%Period 8 of 2024-25: 0.7%Period 9 of 2024-25: 4.6%Period 10 of 2024-25: 5.1%Period 11 of 2024-25: 1.2%Period 12 of 2024-25: 1.5%Period 13 of 2024-25: 0.0%Period 1 of 2025-26: 2.3%Period 2 of 2025-26: 3.8%Period 3 of 2025-26: 0.0%Period 4 of 2025-26: 4.1%Period 5 of 2025-26: 1.3%Period 6 of 2025-26: 1.6%Period 10 of 2025-26: 5.7%Period 2 of 2026-27: 5.4%Period 5 of 2026-27: 2.2%Period 6 of 2026-27: 0.0%2023-242024-252025-262026-27

See how TransPennine Express Delay Repay works

The last 13 periods

Time of year

40%60%80%P1: 65.9%1P2: 63.6%2P3: 66.4%3P4: 63.4%4P5: 65.2%5P6: 61.4%6P7: 56.8%7P8: 54.6%8P9: 43.5%9P10: 56.6%10P11: 55.7%11P12: 58.6%12P13: 65.8%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Cottingley

OperatorScheduled stopsWithin 3 minCancelled
Northern11,02673.7%1.9%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out