Northern at Cottingley
All trains at CottingleyNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 11,026 scheduled stops at Cottingley in the 13 periods to Period 7 of 2026-27, 94% of the station's total. 73.7% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.
Northern trains at Cottingley also serve Morley (1.9 km south, 75.8% on time, 2.4% cancelled), Leeds (3.9 km north-east, 79.5% on time, 2.2% cancelled), Burley Park (4.9 km north, 74.7% on time, 3.0% cancelled), Bramley (West Yorkshire) (5.3 km north-west, 71.3% on time, 3.1% cancelled), Headingley (5.6 km north, 78.3% on time, 3.0% cancelled) and Batley (6.8 km south, 77.0% on time, 2.4% cancelled), which are the stations on its network closest to Cottingley.
Within 30 km of here, Northern runs best at Bradford Forster Square, 11.4 km west (93.3%), and worst at Sowerby Bridge, 22.1 km west (58.5%).
The busiest Northern station within 30 km of Cottingley is Leeds, 3.9 km north-east, with about 780 scheduled stops a day.
Northern at Cottingley improved sharply over the past year. In the latest 13 periods 73.7% of stops came within three minutes of the timetable, up 5.8 percentage points from 67.9% in the 13 before. Cancellations fell to 1.9% of scheduled stops from 3.0%, which is 1.1 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 927 | 71.4% | 1.6% |
| Period 6 of 2026-27 | 821 | 73.2% | 1.7% |
| Period 5 of 2026-27 | 823 | 70.6% | 3.0% |
| Period 4 of 2026-27 | 1,016 | 72.3% | 2.2% |
| Period 3 of 2026-27 | 32 | – | – |
| Period 2 of 2026-27 | 835 | 74.2% | 1.6% |
| Period 1 of 2026-27 | 1,111 | 81.7% | 1.2% |
| Period 13 of 2025-26 | 1,083 | 80.6% | 0.7% |
| Period 12 of 2025-26 | 976 | 79.5% | 2.2% |
| Period 11 of 2025-26 | 980 | 76.1% | 2.6% |
| Period 10 of 2025-26 | 828 | 72.0% | 3.0% |
| Period 9 of 2025-26 | 974 | 58.4% | 2.0% |
| Period 8 of 2025-26 | 620 | 71.1% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Cottingley
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 685 | 76.2% | 2.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out