Alfreton
ALFEast MidlandsManaged by East Midlands Railway
How this station is performing
Alfreton had 23,666 scheduled stops to Period 7 of 2026-27, about 65 a day. 71.1% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Alfreton opened on 1 May 1862 and closed to passengers on 2 January 1967. It reopened on 7 May 1973, 53 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Ambergate is the oldest (1840) and Kirkby-in-Ashfield the newest (1996), with Alfreton in between.
The nearest stations to Alfreton are Kirkby-in-Ashfield (7.8 km east), Sutton Parkway (8.4 km east), Ambergate (8.7 km south-west), Whatstandwell (9.2 km west) and Langley Mill (9.6 km south). 5 stations lie within 10 km in all. At 71.1%, Alfreton is less punctual than all of them; the best of the five, Ambergate, manages 85.7%.
Alfreton takes its name from a town called Alfreton, home to about 8,794 people, and the station stands 0.9 km from its centre.
2 operators call at Alfreton: Northern (78.1%, 53% of stops) and East Midlands Railway (63.1%, 47% of stops). The operator you travel with matters: Northern reaches 78.1% within three minutes while East Midlands Railway manages 63.1%, a gap of 15.0 percentage points.
2 of 3 stations of a similar size in East Midlands are more punctual than Alfreton on 71.1%. The comparison group includes Attenborough (81.7%), New Mills Central (82.5%) and Market Harborough (59.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 12,499 | 78.1% | 2.1% |
| East Midlands Railway | 11,167 | 63.1% | 3.5% |
Operators with their own page for this station are linked to it.
Late train at Alfreton? Delay Repay
These operators call at Alfreton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,843 | 73.3% | 1.7% |
| Period 6 of 2026-27 | 1,787 | 64.2% | 2.4% |
| Period 5 of 2026-27 | 1,473 | 68.1% | 2.6% |
| Period 4 of 2026-27 | 1,766 | 71.5% | 3.5% |
| Period 3 of 2026-27 | 1,840 | 66.5% | 5.0% |
| Period 2 of 2026-27 | 1,844 | 68.7% | 3.2% |
| Period 1 of 2026-27 | 2,113 | 76.6% | 1.7% |
| Period 13 of 2025-26 | 1,966 | 71.7% | 2.4% |
| Period 12 of 2025-26 | 1,844 | 76.9% | 1.7% |
| Period 11 of 2025-26 | 1,828 | 79.5% | 2.7% |
| Period 10 of 2025-26 | 1,687 | 70.9% | 2.9% |
| Period 9 of 2025-26 | 1,835 | 63.5% | 4.3% |
| Period 8 of 2025-26 | 1,840 | 70.5% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Attenborough | 23,600 | 81.7% | 2.7% |
| New Mills Central | 23,778 | 82.5% | 1.9% |
| Market Harborough | 23,434 | 59.5% | 4.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out