Hever
HEVSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Hever has usable figures for 11 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,339 scheduled stops, about 34 a day. In those periods 70.5% of stops arrived within three minutes of the timetable and 4.2% of scheduled stops were cancelled.
Hever opened on 1 October 1888, 138 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hever is the newest; the oldest, Edenbridge (Kent), opened in 1842.
The nearest stations to Hever are Edenbridge Town (2.9 km north-west), Cowden (Kent) (3.1 km south), Edenbridge (Kent) (3.9 km north-west), Penshurst (5.7 km east) and Ashurst (Kent) (7.1 km south-east). 11 stations lie within 10 km in all. Of the five, Edenbridge (Kent) is the most punctual at 91.1% and Cowden (Kent) the least at 68.4%, with Hever on 70.5%.
Hever takes its name from a Village called Hever, home to about 1,238 people, and the station stands 1.1 km from its centre.
2 of 3 stations of a similar size in South East are more punctual than Hever on 70.5%. The comparison group includes Cowden (Kent) (68.4%), Buxted (75.7%) and Ashurst (Kent) (74.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 12,339 | 70.5% | 4.2% |
Operators with their own page for this station are linked to it.
Late train at Hever? Delay Repay
These operators call at Hever and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 982 | 4.2% | 2.9% |
| Period 6 of 2026-27 | 727 | – | 15.3% |
| Period 5 of 2026-27 | 887 | – | 10.5% |
| Period 4 of 2026-27 | 985 | 71.3% | 5.1% |
| Period 3 of 2026-27 | 928 | 69.1% | 4.8% |
| Period 2 of 2026-27 | 869 | 86.3% | 3.0% |
| Period 1 of 2026-27 | 1,127 | 83.6% | 2.1% |
| Period 13 of 2025-26 | 1,092 | 85.0% | 1.1% |
| Period 12 of 2025-26 | 974 | 73.1% | 2.1% |
| Period 11 of 2025-26 | 959 | 78.2% | 1.9% |
| Period 10 of 2025-26 | 881 | 73.8% | 3.3% |
| Period 9 of 2025-26 | 941 | 71.8% | 4.3% |
| Period 8 of 2025-26 | 987 | 76.5% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cowden (Kent) | 12,346 | 68.4% | 4.4% |
| Buxted | 12,318 | 75.7% | 5.9% |
| Ashurst (Kent) | 12,363 | 74.6% | 4.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out