Collington
CLLSouth EastManaged by Govia Thameslink Railway (Southern)
How this station is performing
Collington had 29,001 scheduled stops to Period 7 of 2026-27, about 80 a day. 83.0% of recorded arrivals were within three minutes of the timetable and 4.9% of scheduled stops were cancelled.
Collington opened on 11 September 1905 and closed to passengers on 1 September 1906. It reopened on 1 June 1911, 115 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Collington is the newest; the oldest, Bexhill, opened in 1846.
The nearest stations to Collington are Bexhill (1.3 km east), Cooden Beach (2.2 km west), Normans Bay (5.0 km west), West St Leonards (6.0 km east) and Crowhurst (6.3 km north-east). 11 stations lie within 10 km in all. At 83.0%, Collington is more punctual than every one of them; the best of the five, Bexhill, manages 82.7%.
Collington has slipped sharply. 83.0% of stops came within three minutes of the timetable in the latest 13 periods, 5.8 percentage points worse than the 88.8% recorded in the 13 before. Cancellations rose to 4.9% of scheduled stops from 3.7%, which is 1.2 percentage points more.
Compared with 3 stations of a similar size in South East, Collington is the most punctual, at 83.0%. The comparison group includes Esher (80.1%), Cooden Beach (82.5%) and Ewell West (83.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 29,001 | 83.0% | 4.9% |
Operators with their own page for this station are linked to it.
Late train at Collington? Delay Repay
These operators call at Collington and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,296 | 71.8% | 7.6% |
| Period 6 of 2026-27 | 2,157 | 55.2% | 7.5% |
| Period 5 of 2026-27 | 1,863 | 76.1% | 7.1% |
| Period 4 of 2026-27 | 2,299 | 85.2% | 3.1% |
| Period 3 of 2026-27 | 2,210 | 84.7% | 6.6% |
| Period 2 of 2026-27 | 2,270 | 86.6% | 8.4% |
| Period 1 of 2026-27 | 2,318 | 89.7% | 5.5% |
| Period 13 of 2025-26 | 2,542 | 91.0% | 3.2% |
| Period 12 of 2025-26 | 2,202 | 89.2% | 2.5% |
| Period 11 of 2025-26 | 2,320 | 90.5% | 2.4% |
| Period 10 of 2025-26 | 2,087 | 87.4% | 2.9% |
| Period 9 of 2025-26 | 2,196 | 83.9% | 3.1% |
| Period 8 of 2025-26 | 2,241 | 83.5% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Esher | 28,642 | 80.1% | 3.2% |
| Cooden Beach | 29,411 | 82.5% | 4.8% |
| Ewell West | 28,592 | 83.0% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out