Clydebank
CYKScotlandManaged by ScotRail
How this station is performing
Clydebank had 44,553 scheduled stops to Period 7 of 2026-27, about 122 a day. 86.8% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Clydebank opened on 17 May 1897, 129 years before the latest figures here, and has not been moved since. The First World War closed Clydebank on 1 January 1917, and it reopened on 2 June 1919. Among the 5 stations nearest to it with a known opening date, Dalmuir is the oldest (1858) and Drumry the newest (1953), with Clydebank in between.
The nearest stations to Clydebank are Singer (0.8 km north), Drumry (1.2 km east), Yoker (1.3 km south-east), Dalmuir (1.9 km north-west) and Drumchapel (2.6 km east). 39 stations lie within 10 km in all. Of the five, Yoker is the most punctual at 87.8% and Singer the least at 84.9%, with Clydebank on 86.8%.
Clydebank takes its name from a town called Clydebank, home to about 26,320 people, and the station stands 0.2 km from its centre.
Compared with 3 stations of a similar size in Scotland, Clydebank is the least punctual, at 86.8%. All of them are ahead, including Yoker (87.8%), Coatdyke (88.7%) and Blairhill (87.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 44,553 | 86.8% | 2.4% |
Operators with their own page for this station are linked to it.
Late train at Clydebank? Delay Repay
These operators call at Clydebank and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,389 | 83.8% | 3.0% |
| Period 6 of 2026-27 | 3,404 | 88.6% | 1.7% |
| Period 5 of 2026-27 | 3,404 | 86.9% | 1.7% |
| Period 4 of 2026-27 | 3,382 | 88.4% | 4.7% |
| Period 3 of 2026-27 | 3,404 | 89.3% | 1.6% |
| Period 2 of 2026-27 | 3,392 | 87.7% | 1.1% |
| Period 1 of 2026-27 | 3,903 | 89.0% | 1.9% |
| Period 13 of 2025-26 | 3,698 | 88.7% | 1.3% |
| Period 12 of 2025-26 | 3,380 | 89.2% | 2.0% |
| Period 11 of 2025-26 | 3,381 | 89.4% | 1.9% |
| Period 10 of 2025-26 | 3,064 | 85.2% | 2.8% |
| Period 9 of 2025-26 | 3,376 | 81.0% | 4.1% |
| Period 8 of 2025-26 | 3,376 | 80.6% | 4.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out