Cleethorpes
CLEYorkshire and The HumberManaged by TransPennine Express
How this station is performing
Cleethorpes had 22,144 scheduled stops to Period 7 of 2026-27, about 61 a day. 81.1% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Cleethorpes opened on 6 April 1863, 163 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Grimsby Town is the oldest (1848) and Healing the newest (1881), with Cleethorpes in between.
The nearest stations to Cleethorpes are New Clee (2.4 km north-west), Grimsby Docks (3.3 km north-west), Grimsby Town (3.7 km west), Great Coates (6.7 km west) and Healing (8.9 km west). 5 stations lie within 10 km in all. At 81.1%, Cleethorpes is more punctual than every one of them; the best of the five, Grimsby Town, manages 79.7%.
Cleethorpes takes its name from a seaside resort called Cleethorpes, home to about 38,996 people, and the station stands 1.2 km from its centre.
3 operators call at Cleethorpes: TransPennine Express (79.0%, 54% of stops), East Midlands Railway (83.2%, 44% of stops) and Northern (–, 2% of stops). They are close together, with East Midlands Railway leading on 83.2% and TransPennine Express trailing on 79.0%, a gap of 4.2 percentage points.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Cleethorpes is the most punctual, at 81.1%. The comparison group includes Church Fenton (74.3%), Cattal (76.1%) and Hammerton (77.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 11,904 | 79.0% | 2.9% |
| East Midlands Railway | 9,716 | 83.2% | 4.2% |
| Northern | 524 | – | – |
Operators with their own page for this station are linked to it.
Late train at Cleethorpes? Delay Repay
These operators call at Cleethorpes and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,696 | 83.7% | 1.4% |
| Period 6 of 2026-27 | 1,758 | 84.3% | 3.4% |
| Period 5 of 2026-27 | 1,760 | 75.4% | 7.0% |
| Period 4 of 2026-27 | 1,767 | 79.9% | 3.6% |
| Period 3 of 2026-27 | 1,762 | 76.8% | 2.7% |
| Period 2 of 2026-27 | 1,507 | 82.1% | 5.3% |
| Period 1 of 2026-27 | 1,998 | 85.4% | 2.8% |
| Period 13 of 2025-26 | 1,897 | 87.0% | 2.4% |
| Period 12 of 2025-26 | 1,722 | 85.5% | 2.2% |
| Period 11 of 2025-26 | 1,727 | 84.5% | 2.7% |
| Period 10 of 2025-26 | 1,522 | 80.2% | 4.3% |
| Period 9 of 2025-26 | 1,508 | 71.0% | 3.2% |
| Period 8 of 2025-26 | 1,520 | 74.8% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Church Fenton | 21,983 | 74.3% | 3.1% |
| Cattal | 21,679 | 76.1% | 2.7% |
| Hammerton | 21,679 | 77.8% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out