Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Chiltern Railways at Claverdon

All trains at ClaverdonChiltern Railways across BritainWest Midlands

On time, last 13 periods90.1%Whole station: 89.7%
Cancelled1.1%Whole station: 2.3%
Scheduled stops4,630Of 6,357 at the station

How this operator is doing here

Chiltern Railways had 4,630 scheduled stops at Claverdon in the 13 periods to Period 7 of 2026-27, 73% of the station's total. 90.1% of recorded arrivals came within three minutes and 1.1% of stops were cancelled.

Chiltern Railways trains at Claverdon also serve Hatton (2.6 km north-east, 85.2% on time, 1.2% cancelled), Bearley (5.1 km south-west, 90.4% on time, 1.1% cancelled), Warwick Parkway (5.8 km east, 82.7% on time, 1.1% cancelled), Wilmcote (7.3 km south-west, 91.0% on time, 1.2% cancelled), Lapworth (7.5 km north, 82.4% on time, 1.3% cancelled) and Warwick (7.8 km east, 84.4% on time, 1.1% cancelled), which are the stations on its network closest to Claverdon.

Within 30 km of here, Chiltern Railways runs best at Stratford-upon-Avon Parkway, 8.2 km south (92.7%), and worst at Lapworth, 7.5 km north (82.4%).

The busiest Chiltern Railways station within 30 km of Claverdon is Leamington Spa, 11.0 km east, with about 81 scheduled stops a day.

Of the 2 operators with enough records at Claverdon, Chiltern Railways is the most punctual, at 90.1%.

For Chiltern Railways, Claverdon is the 15th best of 51 ranked stations. Its 90.1% here is 2.4 percentage points above the 87.7% across the whole network.

Cancellations of Chiltern Railways at Claverdon are near its usual level: 1.1% of scheduled stops, against 1.4% across its network and 2.3% for every operator at the station.

Period by period

80%90%100%2023-242024-252025-262026-27Period 1 of 2023-24: 78.4%Period 10 of 2025-26: 91.8%Period 11 of 2025-26: 96.1%Period 12 of 2025-26: 95.7%Period 13 of 2025-26: 94.3%Period 2 of 2026-27: 86.7%Period 3 of 2026-27: 89.4%Period 4 of 2026-27: 86.1%Period 5 of 2026-27: 85.3%Period 6 of 2026-27: 88.5%Period 7 of 2026-27: 84.8%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 0.8%Period 2 of 2023-24: 0.4%Period 3 of 2023-24: 0.6%Period 4 of 2023-24: 1.4%Period 5 of 2023-24: 2.4%Period 6 of 2023-24: 2.1%Period 7 of 2023-24: 1.2%Period 8 of 2023-24: 2.4%Period 9 of 2023-24: 4.8%Period 10 of 2023-24: 8.6%Period 11 of 2023-24: 0.6%Period 12 of 2023-24: 0.6%Period 13 of 2023-24: 3.2%Period 1 of 2024-25: 2.4%Period 2 of 2024-25: 6.3%Period 3 of 2024-25: 1.4%Period 4 of 2024-25: 0.5%Period 5 of 2024-25: 1.6%Period 6 of 2024-25: 0.8%Period 7 of 2024-25: 2.1%Period 8 of 2024-25: 1.1%Period 9 of 2024-25: 1.9%Period 10 of 2024-25: 3.7%Period 11 of 2024-25: 3.2%Period 12 of 2024-25: 1.1%Period 13 of 2024-25: 1.3%Period 1 of 2025-26: 0.7%Period 2 of 2025-26: 1.1%Period 3 of 2025-26: 3.9%Period 4 of 2025-26: 2.1%Period 5 of 2025-26: 1.1%Period 6 of 2025-26: 0.6%Period 7 of 2025-26: 1.6%Period 8 of 2025-26: 1.7%Period 9 of 2025-26: 0.6%Period 10 of 2025-26: 0.9%Period 11 of 2025-26: 0.8%Period 12 of 2025-26: 1.9%Period 13 of 2025-26: 0.7%Period 1 of 2026-27: 0.0%Period 2 of 2026-27: 3.0%Period 3 of 2026-27: 1.2%Period 4 of 2026-27: 1.6%Period 5 of 2026-27: 0.0%Period 6 of 2026-27: 1.6%Period 7 of 2026-27: 0.3%2023-242024-252025-262026-27

See how Chiltern Railways Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2734884.8%0.3%
Period 6 of 2026-2737688.5%1.6%
Period 5 of 2026-2737685.3%0.0%
Period 4 of 2026-2737686.1%1.6%
Period 3 of 2026-2734789.4%1.2%
Period 2 of 2026-2736286.7%3.0%
Period 1 of 2026-27360–0.0%
Period 13 of 2025-2640894.3%0.7%
Period 12 of 2025-2637695.7%1.9%
Period 11 of 2025-2636096.1%0.8%
Period 10 of 2025-2623391.8%0.9%
Period 9 of 2025-26360–0.6%
Period 8 of 2025-26348–1.7%

Other operators at Claverdon

OperatorScheduled stopsWithin 3 minCancelled
West Midlands Railway1,72789.7%5.5%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out