Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

TransPennine Express at Chorley

All trains at ChorleyTransPennine Express across BritainNorth West

On time, last 13 periods81.1%Whole station: 59.4%
Cancelled4.3%Whole station: 4.6%
Scheduled stops256Of 33,865 at the station

How this operator is doing here

TransPennine Express had 256 scheduled stops at Chorley in the 13 periods to Period 7 of 2026-27, 1% of the station's total. 81.1% of recorded arrivals came within three minutes and 4.3% of stops were cancelled.

TransPennine Express trains at Chorley also serve Buckshaw Parkway (3.1 km north-west, 90.2% on time, 4.2% cancelled), Blackrod (7.8 km south-east, – on time, – cancelled), Horwich Parkway (10.1 km south-east, 81.6% on time, 4.3% cancelled), Wigan North Western (12.2 km south, 69.7% on time, 8.1% cancelled), Preston (Lancs) (12.6 km north-west, 64.9% on time, 4.6% cancelled) and Bolton (16.0 km south-east, 58.3% on time, 5.0% cancelled), which are the stations on its network closest to Chorley.

Within 30 km of here, TransPennine Express runs best at Newton-le-Willows, 22.2 km south (76.2%), and worst at Irlam, 27.5 km south-east (53.8%).

The busiest TransPennine Express station within 30 km of Chorley is Preston (Lancs), 12.6 km north-west, with about 40 scheduled stops a day.

Of the 2 operators with enough records at Chorley, TransPennine Express is the most punctual, at 81.1%.

Cancellations of TransPennine Express at Chorley are near its usual level: 4.3% of scheduled stops, against 3.3% across its network and 4.6% for every operator at the station.

Period by period

75%80%85%90%2023-242024-252025-262026-27Period 1 of 2026-27: 81.1%
This pageGreat Britain
0%2%4%6%Period 1 of 2026-27: 4.3%2023-242024-252025-262026-27

See how TransPennine Express Delay Repay works

The last 13 periods

Other operators at Chorley

OperatorScheduled stopsWithin 3 minCancelled
Northern33,60959.3%4.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out