Northern at Chorley
How this operator is doing here
Northern had 33,609 scheduled stops at Chorley in the 13 periods to Period 7 of 2026-27, 99% of the station's total. 59.3% of recorded arrivals came within three minutes and 4.6% of stops were cancelled.
Northern trains at Chorley also serve Euxton Balshaw Lane (3.0 km west, 84.2% on time, 2.9% cancelled), Buckshaw Parkway (3.1 km north-west, 59.6% on time, 4.8% cancelled), Adlington (Lancashire) (4.7 km south, 56.3% on time, 5.1% cancelled), Leyland (6.5 km north-west, 75.9% on time, 4.2% cancelled), Blackrod (7.8 km south-east, 56.3% on time, 5.0% cancelled) and Bamber Bridge (8.5 km north, 83.6% on time, 3.0% cancelled), which are the stations on its network closest to Chorley.
Within 30 km of here, Northern runs best at Thatto Heath, 25.6 km south (90.7%), and worst at Moses Gate, 18.4 km south-east (52.6%).
The busiest Northern station within 30 km of Chorley is Preston (Lancs), 12.6 km north-west, with about 260 scheduled stops a day.
Northern at Chorley has slipped a little, from 62.4% within three minutes in the previous 13 periods to 59.3% in the latest 13, a fall of 3.1 percentage points. Cancellations fell to 4.6% of scheduled stops from 6.2%, which is 1.6 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,583 | 58.1% | 4.1% |
| Period 6 of 2026-27 | 2,584 | 63.6% | 3.3% |
| Period 5 of 2026-27 | 2,605 | 60.3% | 5.7% |
| Period 4 of 2026-27 | 2,561 | 57.6% | 5.2% |
| Period 3 of 2026-27 | 2,580 | 56.3% | 5.5% |
| Period 2 of 2026-27 | 2,600 | 62.8% | 3.5% |
| Period 1 of 2026-27 | 2,703 | 60.0% | 3.5% |
| Period 13 of 2025-26 | 2,833 | 61.9% | 9.4% |
| Period 12 of 2025-26 | 2,580 | 63.6% | 2.6% |
| Period 11 of 2025-26 | 2,549 | 64.5% | 2.0% |
| Period 10 of 2025-26 | 2,262 | 58.8% | 7.4% |
| Period 9 of 2025-26 | 2,589 | 48.6% | 4.5% |
| Period 8 of 2025-26 | 2,580 | 53.8% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Chorley
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 256 | 81.1% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out