CrossCountry at Chepstow
How this operator is doing here
CrossCountry had 6,578 scheduled stops at Chepstow in the 13 periods to Period 7 of 2026-27, 38% of the station's total. 77.6% of recorded arrivals came within three minutes and 11.8% of stops were cancelled.
CrossCountry trains at Chepstow also serve Caldicot (8.7 km south-west, 80.4% on time, 16.1% cancelled), Severn Tunnel Junction (9.6 km south-west, 78.8% on time, 16.1% cancelled), Lydney (12.7 km north-east, 74.7% on time, 13.3% cancelled), Bristol Parkway (16.6 km south-east, 59.0% on time, 4.7% cancelled), Yate (19.8 km south-east, – on time, – cancelled) and Bristol Temple Meads (22.1 km south, 57.7% on time, 5.7% cancelled), which are the stations on its network closest to Chepstow.
Within 30 km of here, CrossCountry runs best at Lydney, 12.7 km north-east (74.7%), and worst at Bristol Temple Meads, 22.1 km south (57.7%).
The busiest CrossCountry station within 30 km of Chepstow is Bristol Temple Meads, 22.1 km south, with about 58 scheduled stops a day.
CrossCountry at Chepstow has slipped a little, from 82.1% within three minutes in the previous 13 periods to 77.6% in the latest 13, a fall of 4.5 percentage points. Cancellations rose to 11.8% of scheduled stops from 9.8%, which is 2.0 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 482 | 69.4% | 14.5% |
| Period 6 of 2026-27 | 548 | 69.3% | 15.5% |
| Period 5 of 2026-27 | 453 | 68.0% | 12.4% |
| Period 4 of 2026-27 | 548 | 76.2% | 11.1% |
| Period 3 of 2026-27 | 479 | 80.7% | 12.5% |
| Period 2 of 2026-27 | 524 | 76.5% | 19.7% |
| Period 1 of 2026-27 | 583 | 83.2% | 6.0% |
| Period 13 of 2025-26 | 542 | 79.3% | 5.7% |
| Period 12 of 2025-26 | 500 | 84.0% | 5.2% |
| Period 11 of 2025-26 | 489 | 88.3% | 5.9% |
| Period 10 of 2025-26 | 449 | 80.3% | 21.8% |
| Period 9 of 2025-26 | 501 | 71.0% | 18.0% |
| Period 8 of 2025-26 | 480 | 79.8% | 7.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Chepstow
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 10,599 | 68.6% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out