Transport for Wales at Chepstow
All trains at ChepstowTransport for Wales across BritainWales
How this operator is doing here
Transport for Wales had 10,599 scheduled stops at Chepstow in the 13 periods to Period 7 of 2026-27, 62% of the station's total. 68.6% of recorded arrivals came within three minutes and 3.5% of stops were cancelled.
Transport for Wales trains at Chepstow also serve Caldicot (8.7 km south-west, 69.5% on time, 3.4% cancelled), Severn Tunnel Junction (9.6 km south-west, 70.5% on time, 3.4% cancelled), Lydney (12.7 km north-east, 65.8% on time, 3.8% cancelled), Newport (South Wales) (23.4 km west, 77.1% on time, 3.4% cancelled), Cwmbran (23.9 km west, 68.2% on time, 3.1% cancelled) and Pontypool and New Inn (24.5 km west, 73.0% on time, 3.3% cancelled), which are the stations on its network closest to Chepstow.
Within 30 km of here, Transport for Wales runs best at Pye Corner, 26.4 km west (88.2%), and worst at Lydney, 12.7 km north-east (65.8%).
The busiest Transport for Wales station within 30 km of Chepstow is Newport (South Wales), 23.4 km west, with about 113 scheduled stops a day.
Of the 2 operators with enough records at Chepstow, Transport for Wales is the least punctual, at 68.6%.
Over three full railway years Transport for Wales at Chepstow has improved each time, from 65.3% within three minutes in 2023-24 to 70.9% in 2024-25 and 71.3% in 2025-26.
Period by period
See how Transport for Wales Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 834 | 65.6% | 3.5% |
| Period 6 of 2026-27 | 751 | 65.5% | 5.9% |
| Period 5 of 2026-27 | 685 | 52.0% | 13.6% |
| Period 4 of 2026-27 | 703 | 65.0% | 5.7% |
| Period 3 of 2026-27 | 839 | 71.6% | 2.1% |
| Period 2 of 2026-27 | 836 | 65.7% | 3.3% |
| Period 1 of 2026-27 | 957 | 74.4% | 1.5% |
| Period 13 of 2025-26 | 907 | 75.5% | 1.0% |
| Period 12 of 2025-26 | 837 | 76.1% | 1.7% |
| Period 11 of 2025-26 | 828 | 80.5% | 1.9% |
| Period 10 of 2025-26 | 755 | 63.8% | 2.6% |
| Period 9 of 2025-26 | 839 | 61.0% | 4.4% |
| Period 8 of 2025-26 | 828 | 67.7% | 0.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Chepstow
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 6,578 | 77.6% | 11.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out