Cathays
CYSWalesManaged by TfW Rail
How this station is performing
Cathays had 62,327 scheduled stops to Period 7 of 2026-27, about 171 a day. 92.3% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Cathays opened on 2 July 1906 and closed to passengers on 15 September 1958. It reopened on 3 October 1983, 43 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Cardiff Queen Street is the oldest (1840) and Ninian Park the newest (1912), with Cathays in between.
The nearest stations to Cathays are Cardiff Queen Street (1.0 km south-east), Cardiff Central (1.5 km south), Ninian Park (2.1 km south-west), Cardiff Bay (2.5 km south) and Grangetown (Cardiff) (2.5 km south). 27 stations lie within 10 km in all. Of the five, Cardiff Bay is the most punctual at 95.7% and Cardiff Central the least at 83.5%, with Cathays on 92.3%.
Cathays takes its name from a suburb called Cathays, home to about 19,192 people, and the station stands 0.7 km from its centre.
2 of 3 stations of a similar size in Wales are more punctual than Cathays on 92.3%. The comparison group includes Llandaf (93.3%), Bridgend (70.4%) and Caerphilly (93.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 62,327 | 92.3% | 2.9% |
Operators with their own page for this station are linked to it.
Late train at Cathays? Delay Repay
These operators call at Cathays and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,626 | 93.6% | 3.6% |
| Period 6 of 2026-27 | 5,064 | 93.2% | 5.3% |
| Period 5 of 2026-27 | 4,157 | 93.2% | 3.2% |
| Period 4 of 2026-27 | 4,125 | 92.2% | 2.8% |
| Period 3 of 2026-27 | 4,681 | 92.7% | 4.2% |
| Period 2 of 2026-27 | 4,709 | 93.6% | 4.4% |
| Period 1 of 2026-27 | 5,606 | 93.8% | 2.8% |
| Period 13 of 2025-26 | 5,338 | 94.2% | 1.2% |
| Period 12 of 2025-26 | 5,214 | 93.2% | 2.1% |
| Period 11 of 2025-26 | 5,085 | 93.1% | 3.5% |
| Period 10 of 2025-26 | 4,601 | 89.2% | 1.8% |
| Period 9 of 2025-26 | 4,869 | 88.2% | 1.6% |
| Period 8 of 2025-26 | 5,252 | 90.0% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Llandaf | 62,324 | 93.3% | 3.0% |
| Bridgend | 56,899 | 70.4% | 2.2% |
| Caerphilly | 55,463 | 93.5% | 3.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out