Bridgend
BGNWalesManaged by TfW Rail
How this station is performing
Bridgend had 56,899 scheduled stops to Period 7 of 2026-27, about 156 a day. 70.4% of recorded arrivals were within three minutes of the timetable and 2.2% of scheduled stops were cancelled.
Bridgend opened on 19 June 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Bridgend is the oldest; the next oldest, Pencoed, dates from 1850.
The nearest stations to Bridgend are Wildmill (1.5 km north), Sarn (3.6 km north), Tondu (4.7 km north), Pencoed (5.4 km east) and Pyle (8.7 km west). 6 stations lie within 10 km in all. Of the five, Wildmill is the most punctual at 74.2% and Pyle the least at 64.0%, with Bridgend on 70.4%.
Bridgend is one of 9 stations named after a market town called Bridgend, home to about 49,404 people; this one stands 0.2 km from its centre.
2 operators call at Bridgend: Transport for Wales (73.7%, 74% of stops) and Great Western Railway (61.2%, 26% of stops). The operator you travel with matters: Transport for Wales reaches 73.7% within three minutes while Great Western Railway manages 61.2%, a gap of 12.5 percentage points.
Compared with 3 stations of a similar size in Wales, Bridgend is the least punctual, at 70.4%. All of them are ahead, including Caerphilly (93.5%), Heath High Level (93.4%) and Lisvane and Thornhill (92.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 42,096 | 73.7% | 2.2% |
| Great Western Railway | 14,803 | 61.2% | 2.2% |
Operators with their own page for this station are linked to it.
Late train at Bridgend? Delay Repay
These operators call at Bridgend and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,335 | 68.9% | 2.0% |
| Period 6 of 2026-27 | 4,373 | 69.6% | 1.7% |
| Period 5 of 2026-27 | 4,239 | 63.9% | 4.5% |
| Period 4 of 2026-27 | 4,323 | 68.0% | 2.8% |
| Period 3 of 2026-27 | 4,277 | 71.5% | 1.9% |
| Period 2 of 2026-27 | 4,392 | 72.8% | 2.3% |
| Period 1 of 2026-27 | 5,110 | 76.0% | 1.9% |
| Period 13 of 2025-26 | 4,771 | 76.9% | 1.4% |
| Period 12 of 2025-26 | 4,222 | 77.6% | 1.5% |
| Period 11 of 2025-26 | 4,131 | 78.7% | 1.2% |
| Period 10 of 2025-26 | 3,928 | 67.0% | 2.8% |
| Period 9 of 2025-26 | 4,405 | 57.3% | 2.8% |
| Period 8 of 2025-26 | 4,393 | 65.7% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caerphilly | 55,463 | 93.5% | 3.0% |
| Heath High Level | 52,982 | 93.4% | 4.1% |
| Lisvane and Thornhill | 52,939 | 92.7% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out