Castleford
CFDYorkshire and The HumberManaged by Northern Trains
How this station is performing
Castleford had 35,998 scheduled stops to Period 7 of 2026-27, about 99 a day. 79.3% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Castleford opened on 1 July 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Castleford is the oldest; the next oldest, Pontefract Monkhill, dates from 1848.
The nearest stations to Castleford are Glasshoughton (1.9 km south-east), Pontefract Tanshelf (4.1 km south-east), Pontefract Monkhill (4.4 km south-east), Pontefract Baghill (5.0 km south-east) and Featherstone (5.0 km south). 13 stations lie within 10 km in all. Of the five, Glasshoughton is the most punctual at 80.2% and Pontefract Baghill the least at 64.7%, with Castleford on 79.3%.
Castleford takes its name from a town called Castleford, home to about 45,106 people, and the station stands 0.9 km from its centre.
2 operators call at Castleford: Northern (81.8%, 69% of stops) and TransPennine Express (73.6%, 31% of stops). The operator you travel with matters: Northern reaches 81.8% within three minutes while TransPennine Express manages 73.6%, a gap of 8.2 percentage points.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Castleford is the most punctual, at 79.3%. The comparison group includes Bramley (West Yorkshire) (71.3%), Garforth (67.7%) and Horsforth (77.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 24,768 | 81.8% | 3.0% |
| TransPennine Express | 11,230 | 73.6% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Castleford? Delay Repay
These operators call at Castleford and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,736 | 81.8% | 2.7% |
| Period 6 of 2026-27 | 2,707 | 80.5% | 1.9% |
| Period 5 of 2026-27 | 2,802 | 79.0% | 3.5% |
| Period 4 of 2026-27 | 2,760 | 75.4% | 4.9% |
| Period 3 of 2026-27 | 2,800 | 80.6% | 3.5% |
| Period 2 of 2026-27 | 2,801 | 83.4% | 3.7% |
| Period 1 of 2026-27 | 3,228 | 83.4% | 1.7% |
| Period 13 of 2025-26 | 3,062 | 84.8% | 1.3% |
| Period 12 of 2025-26 | 2,723 | 78.9% | 1.8% |
| Period 11 of 2025-26 | 2,748 | 80.6% | 3.6% |
| Period 10 of 2025-26 | 2,271 | 77.3% | 2.1% |
| Period 9 of 2025-26 | 2,746 | 67.7% | 3.0% |
| Period 8 of 2025-26 | 2,614 | 74.9% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Bramley (West Yorkshire) | 37,017 | 71.3% | 3.1% |
| Garforth | 33,553 | 67.7% | 2.8% |
| Horsforth | 32,010 | 77.2% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out