Marsh Barton
MBTSouth WestManaged by Great Western Railway
How this station is performing
Marsh Barton has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 15,656 scheduled stops, about 43 a day. In those periods 79.7% of stops arrived within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Marsh Barton opened on 4 July 2023, 3 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Marsh Barton is the newest; the oldest, Exeter St David's, opened in 1844.
The nearest stations to Marsh Barton are Exeter St Thomas (1.9 km north-west), Exeter Central (2.6 km north), St James Park (Exeter) (3.0 km north), Exeter St David's (3.2 km north-west) and Polsloe Bridge (3.3 km north-east). 15 stations lie within 10 km in all. Of the five, St James Park (Exeter) is the most punctual at 82.7% and Exeter St David's the least at 73.6%, with Marsh Barton on 79.7%.
For Marsh Barton, the weakest four-week period in the data is a recent one: Period 5 of 2026-27, when only 69.2% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2024-25, at 89.2%, which is 20.0 percentage points higher. Cancellations peaked at 9.9% of scheduled stops in Period 11 of 2025-26, against 2.3% over the latest 13 periods.
Compared with 3 stations of a similar size in South West, Marsh Barton is the most punctual, at 79.7%. The comparison group includes Parson Street (75.7%), Bedminster (77.8%) and Highbridge and Burnham (72.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 15,656 | 79.7% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Marsh Barton? Delay Repay
These operators call at Marsh Barton and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,196 | 84.6% | 1.7% |
| Period 6 of 2026-27 | 1,196 | 76.6% | 0.6% |
| Period 5 of 2026-27 | 1,189 | 69.2% | 1.3% |
| Period 4 of 2026-27 | 1,151 | 70.3% | 5.5% |
| Period 3 of 2026-27 | 1,195 | 75.3% | 2.8% |
| Period 2 of 2026-27 | 1,197 | 76.4% | 2.3% |
| Period 1 of 2026-27 | 1,375 | 82.7% | 0.7% |
| Period 13 of 2025-26 | 1,311 | 87.0% | 1.8% |
| Period 12 of 2025-26 | 1,190 | 89.0% | 0.2% |
| Period 11 of 2025-26 | 1,187 | 84.1% | 9.9% |
| Period 10 of 2025-26 | 1,078 | 84.2% | 1.0% |
| Period 9 of 2025-26 | 1,195 | – | 1.4% |
| Period 8 of 2025-26 | 1,196 | 79.8% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Parson Street | 15,705 | 75.7% | 3.2% |
| Bedminster | 15,585 | 77.8% | 3.2% |
| Highbridge and Burnham | 15,728 | 72.8% | 2.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out