Highbridge and Burnham
HIGSouth WestManaged by Great Western Railway
How this station is performing
Highbridge and Burnham had 15,728 scheduled stops to Period 7 of 2026-27, about 43 a day. 72.8% of recorded arrivals were within three minutes of the timetable and 2.9% of scheduled stops were cancelled.
Highbridge and Burnham opened on 14 June 1841, 185 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Highbridge and Burnham is the oldest; the next oldest, Bridgwater, dates from 1841.
Highbridge and Burnham is remote: its nearest neighbours are Bridgwater (10.1 km south), Weston-Super-Mare (14.1 km north), Weston Milton (14.7 km north), Worle (16.2 km north) and Yatton (21.7 km north-east). At 72.8%, Highbridge and Burnham is more punctual than every one of them; the best of the five, Weston Milton, manages 72.7%.
Highbridge and Burnham is named after Burnham-on-Sea and Highbridge, a town, home to about 19,576 people, but the station stands 2.9 km from its centre.
For Highbridge and Burnham, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 59.0% of stops arrived within three minutes of the timetable. The strongest was Period 12 of 2025-26, at 84.3%, which is 25.3 percentage points higher. Cancellations peaked at 10.5% of scheduled stops in Period 9 of 2023-24, against 2.9% over the latest 13 periods.
Compared with 3 stations of a similar size in South West, Highbridge and Burnham is the least punctual, at 72.8%. All of them are ahead, including Parson Street (75.7%), Marsh Barton (79.7%) and Bedminster (77.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 15,728 | 72.8% | 2.9% |
Operators with their own page for this station are linked to it.
Late train at Highbridge and Burnham? Delay Repay
These operators call at Highbridge and Burnham and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,212 | 76.6% | 3.4% |
| Period 6 of 2026-27 | 1,196 | 71.5% | 1.9% |
| Period 5 of 2026-27 | 1,219 | 64.6% | 5.3% |
| Period 4 of 2026-27 | 1,221 | 71.7% | 2.3% |
| Period 3 of 2026-27 | 1,200 | 71.8% | 3.8% |
| Period 2 of 2026-27 | 1,203 | 73.5% | 1.8% |
| Period 1 of 2026-27 | 1,345 | 76.7% | 1.0% |
| Period 13 of 2025-26 | 1,305 | 79.6% | 1.1% |
| Period 12 of 2025-26 | 1,201 | 84.3% | 0.9% |
| Period 11 of 2025-26 | 1,154 | 83.2% | 2.7% |
| Period 10 of 2025-26 | 1,075 | 67.3% | 4.3% |
| Period 9 of 2025-26 | 1,220 | 59.0% | 5.2% |
| Period 8 of 2025-26 | 1,177 | 65.0% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Parson Street | 15,705 | 75.7% | 3.2% |
| Marsh Barton | 15,656 | 79.7% | 2.3% |
| Bedminster | 15,585 | 77.8% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out