ScotRail at Carrbridge
How this operator is doing here
ScotRail had 3,958 scheduled stops at Carrbridge in the 13 periods to Period 7 of 2026-27, 92% of the station's total. 68.1% of recorded arrivals came within three minutes and 1.2% of stops were cancelled.
ScotRail trains at Carrbridge also serve Aviemore (10.1 km south, 71.8% on time, 1.1% cancelled), Kingussie (26.2 km south-west, 60.5% on time, 1.1% cancelled), Newtonmore (30.1 km south-west, – on time, 1.0% cancelled), Inverness Airport (31.3 km north-west, 85.5% on time, 2.3% cancelled), Inverness (32.5 km north-west, 87.3% on time, 2.1% cancelled) and Nairn (33.5 km north, 84.4% on time, 2.3% cancelled), which are the stations on its network closest to Carrbridge.
The busiest ScotRail station within 30 km of Carrbridge is Aviemore, 10.1 km south, with about 20 scheduled stops a day.
Of the 1 operators with enough records at Carrbridge, ScotRail is the most punctual, at 68.1%.
For ScotRail, Carrbridge is the 300th best of 312 ranked stations. Its 68.1% here is 19.8 percentage points below the 87.9% across the whole network.
ScotRail at Carrbridge has edged up: 68.1% of stops came within three minutes of the timetable in the latest 13 periods, 1.9 percentage points better than the 66.2% of the 13 before. Cancellations fell to 1.2% of scheduled stops from 1.8%, which is 0.6 percentage points fewer.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 292 | 58.0% | 1.4% |
| Period 6 of 2026-27 | 292 | 72.1% | 0.7% |
| Period 5 of 2026-27 | 292 | 63.5% | 2.4% |
| Period 4 of 2026-27 | 292 | 64.0% | 1.0% |
| Period 3 of 2026-27 | 292 | 69.8% | 0.3% |
| Period 2 of 2026-27 | 304 | 70.8% | 0.7% |
| Period 1 of 2026-27 | 362 | 78.0% | 2.2% |
| Period 13 of 2025-26 | 345 | 81.6% | 0.9% |
| Period 12 of 2025-26 | 316 | 78.1% | 0.3% |
| Period 11 of 2025-26 | 316 | 66.3% | 4.1% |
| Period 10 of 2025-26 | 271 | 66.4% | 0.0% |
| Period 9 of 2025-26 | 313 | 59.7% | 1.0% |
| Period 8 of 2025-26 | 271 | 50.9% | 0.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Carrbridge
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caledonian Sleeper | 310 | – | – |
| LNER | 49 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out