Cardross
CDRScotlandManaged by ScotRail
How this station is performing
Cardross had 25,721 scheduled stops to Period 7 of 2026-27, about 71 a day. 87.9% of recorded arrivals were within three minutes of the timetable and 2.8% of scheduled stops were cancelled.
Cardross opened on 31 May 1858, 168 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Port Glasgow is the oldest (1841) and Woodhall the newest (1945), with Cardross in between.
The nearest stations to Cardross are Woodhall (3.2 km south), Port Glasgow (3.8 km south-west), Renton (4.3 km east), Bogston (4.5 km south-west) and Dalreoch (4.9 km east). 20 stations lie within 10 km in all. Of the five, Port Glasgow is the most punctual at 96.4% and Renton the least at 84.2%, with Cardross on 87.9%.
Cardross takes its name from a Village called Cardross, home to about 2,110 people, and the station stands 1.4 km from its centre.
Across the whole run of data, the weakest four-week period for Cardross was Period 8 of 2024-25, at 76.6%, some time before the latest year. The strongest was Period 4 of 2023-24, at 94.5%, and the two are 17.9 percentage points apart. Cancellations peaked at 7.1% of scheduled stops in Period 8 of 2024-25, against 2.8% over the latest 13 periods.
2 of 3 stations of a similar size in Scotland are more punctual than Cardross on 87.9%. The comparison group includes Ladybank (81.6%), Busby (95.9%) and Clarkston (97.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 25,721 | 87.9% | 2.8% |
Operators with their own page for this station are linked to it.
Late train at Cardross? Delay Repay
These operators call at Cardross and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,955 | 84.6% | 2.1% |
| Period 6 of 2026-27 | 2,000 | 89.4% | 2.8% |
| Period 5 of 2026-27 | 2,000 | 89.1% | 2.6% |
| Period 4 of 2026-27 | 2,000 | 90.5% | 3.8% |
| Period 3 of 2026-27 | 2,000 | 90.8% | 1.5% |
| Period 2 of 2026-27 | 2,000 | 88.9% | 1.7% |
| Period 1 of 2026-27 | 2,290 | 89.7% | 2.1% |
| Period 13 of 2025-26 | 2,208 | 87.6% | 1.3% |
| Period 12 of 2025-26 | 2,000 | 88.8% | 2.5% |
| Period 11 of 2025-26 | 2,000 | 90.0% | 2.8% |
| Period 10 of 2025-26 | 1,390 | 85.9% | 4.0% |
| Period 9 of 2025-26 | 1,939 | 83.1% | 5.2% |
| Period 8 of 2025-26 | 1,939 | 83.2% | 4.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out