CrossCountry at Cardiff Central
All trains at Cardiff CentralCrossCountry across BritainWales
How this operator is doing here
CrossCountry had 10,468 scheduled stops at Cardiff Central in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 74.6% of recorded arrivals came within three minutes and 17.6% of stops were cancelled.
CrossCountry trains at Cardiff Central also serve Newport (South Wales) (17.7 km north-east, 72.1% on time, 15.5% cancelled), Weston-Super-Mare (20.5 km south-east, 55.9% on time, 16.3% cancelled), Severn Tunnel Junction (30.3 km north-east, 78.8% on time, 16.1% cancelled), Caldicot (31.5 km north-east, 80.4% on time, 16.1% cancelled), Chepstow (39.6 km north-east, 77.6% on time, 11.8% cancelled) and Bristol Temple Meads (41.6 km east, 57.7% on time, 5.7% cancelled), which are the stations on its network closest to Cardiff Central.
The busiest CrossCountry station within 30 km of Cardiff Central is Newport (South Wales), 17.7 km north-east, with about 29 scheduled stops a day.
CrossCountry ranks 2nd of the 3 operators with enough records at Cardiff Central, on 74.6%.
For CrossCountry, Cardiff Central is the 12th best of 99 ranked stations. Its 74.6% here is 11.4 percentage points above the 63.2% across the whole network.
Over three full railway years CrossCountry at Cardiff Central has improved each time, from 67.3% within three minutes in 2023-24 to 73.1% in 2024-25 and 75.7% in 2025-26.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 714 | 67.1% | 18.3% |
| Period 6 of 2026-27 | 832 | 69.3% | 22.5% |
| Period 5 of 2026-27 | 623 | 69.1% | 21.0% |
| Period 4 of 2026-27 | 832 | 74.4% | 18.6% |
| Period 3 of 2026-27 | 724 | 76.8% | 16.0% |
| Period 2 of 2026-27 | 824 | 75.6% | 25.0% |
| Period 1 of 2026-27 | 963 | 80.0% | 11.0% |
| Period 13 of 2025-26 | 866 | 73.8% | 9.9% |
| Period 12 of 2025-26 | 832 | 82.6% | 10.3% |
| Period 11 of 2025-26 | 802 | 82.1% | 9.6% |
| Period 10 of 2025-26 | 760 | 73.1% | 26.1% |
| Period 9 of 2025-26 | 863 | 67.8% | 26.0% |
| Period 8 of 2025-26 | 833 | 72.2% | 16.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Cardiff Central
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 193,976 | 87.2% | 2.2% |
| Great Western Railway | 41,691 | 67.7% | 3.9% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out