Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Transport for Wales at Cardiff Central

All trains at Cardiff CentralTransport for Wales across BritainWales

On time, last 13 periods87.2%Whole station: 83.5%
Cancelled2.2%Whole station: 3.2%
Scheduled stops193,976Of 246,135 at the station

How this operator is doing here

Transport for Wales had 193,976 scheduled stops at Cardiff Central in the 13 periods to Period 7 of 2026-27, 79% of the station's total. 87.2% of recorded arrivals came within three minutes and 2.2% of stops were cancelled.

Transport for Wales trains at Cardiff Central also serve Cardiff Queen Street (1.0 km north-east, 94.9% on time, 3.0% cancelled), Grangetown (Cardiff) (1.2 km south-west, 93.8% on time, 3.7% cancelled), Cardiff Bay (1.3 km south-east, 95.7% on time, 4.9% cancelled), Cathays (1.5 km north, 92.3% on time, 2.9% cancelled), Ninian Park (1.5 km west, 92.7% on time, 2.3% cancelled) and Cogan (3.3 km south, 89.8% on time, 3.2% cancelled), which are the stations on its network closest to Cardiff Central.

Within 30 km of here, Transport for Wales runs best at Ton Pentre, 28.6 km north-west (96.6%), and worst at Cwmbran, 23.1 km north-east (68.2%).

The busiest Transport for Wales station within 30 km of Cardiff Central is Cardiff Queen Street, 1.0 km north-east, with about 462 scheduled stops a day.

Transport for Wales at Cardiff Central has edged up: 87.2% of stops came within three minutes of the timetable in the latest 13 periods, 3.4 percentage points better than the 83.8% of the 13 before. Cancellations fell to 2.2% of scheduled stops from 2.7%, which is 0.5 percentage points fewer.

Period by period

70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 77.5%Period 2 of 2023-24: 76.4%Period 3 of 2023-24: 72.6%Period 4 of 2023-24: 77.6%Period 5 of 2023-24: 78.4%Period 6 of 2023-24: 79.9%Period 7 of 2023-24: 79.1%Period 8 of 2023-24: 75.4%Period 9 of 2023-24: 68.9%Period 10 of 2023-24: 77.1%Period 11 of 2023-24: 82.0%Period 12 of 2023-24: 81.8%Period 13 of 2023-24: 82.1%Period 1 of 2024-25: 84.2%Period 2 of 2024-25: 83.7%Period 3 of 2024-25: 78.6%Period 4 of 2024-25: 81.5%Period 5 of 2024-25: 81.2%Period 6 of 2024-25: 80.5%Period 7 of 2024-25: 78.7%Period 8 of 2024-25: 78.2%Period 9 of 2024-25: 74.1%Period 10 of 2024-25: 81.0%Period 11 of 2024-25: 81.8%Period 12 of 2024-25: 83.9%Period 13 of 2024-25: 84.0%Period 1 of 2025-26: 86.5%Period 2 of 2025-26: 84.8%Period 3 of 2025-26: 88.0%Period 4 of 2025-26: 82.2%Period 5 of 2025-26: 88.2%Period 6 of 2025-26: 89.4%Period 7 of 2025-26: 86.7%Period 8 of 2025-26: 84.3%Period 9 of 2025-26: 81.2%Period 10 of 2025-26: 85.7%Period 11 of 2025-26: 91.0%Period 12 of 2025-26: 91.0%Period 13 of 2025-26: 91.0%Period 1 of 2026-27: 89.6%Period 2 of 2026-27: 88.8%Period 3 of 2026-27: 87.9%Period 4 of 2026-27: 85.5%Period 5 of 2026-27: 85.0%Period 6 of 2026-27: 86.5%Period 7 of 2026-27: 85.1%
This pageGreat Britain
0%2%4%6%8%Period 1 of 2023-24: 6.6%Period 2 of 2023-24: 4.8%Period 3 of 2023-24: 8.0%Period 4 of 2023-24: 3.5%Period 5 of 2023-24: 4.0%Period 6 of 2023-24: 3.0%Period 7 of 2023-24: 2.3%Period 8 of 2023-24: 2.0%Period 9 of 2023-24: 4.5%Period 10 of 2023-24: 4.1%Period 11 of 2023-24: 2.7%Period 12 of 2023-24: 3.4%Period 13 of 2023-24: 1.6%Period 1 of 2024-25: 2.9%Period 2 of 2024-25: 1.7%Period 3 of 2024-25: 3.8%Period 4 of 2024-25: 4.0%Period 5 of 2024-25: 2.6%Period 6 of 2024-25: 3.1%Period 7 of 2024-25: 2.3%Period 8 of 2024-25: 2.8%Period 9 of 2024-25: 6.0%Period 10 of 2024-25: 3.6%Period 11 of 2024-25: 2.6%Period 12 of 2024-25: 2.0%Period 13 of 2024-25: 2.4%Period 1 of 2025-26: 3.4%Period 2 of 2025-26: 2.2%Period 3 of 2025-26: 2.3%Period 4 of 2025-26: 2.9%Period 5 of 2025-26: 2.0%Period 6 of 2025-26: 1.5%Period 7 of 2025-26: 1.8%Period 8 of 2025-26: 1.6%Period 9 of 2025-26: 2.8%Period 10 of 2025-26: 2.3%Period 11 of 2025-26: 1.8%Period 12 of 2025-26: 1.0%Period 13 of 2025-26: 1.4%Period 1 of 2026-27: 2.1%Period 2 of 2026-27: 3.5%Period 3 of 2026-27: 2.0%Period 4 of 2026-27: 2.5%Period 5 of 2026-27: 3.8%Period 6 of 2026-27: 2.0%Period 7 of 2026-27: 2.3%2023-242024-252025-262026-27

See how Transport for Wales Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2714,72385.1%2.3%
Period 6 of 2026-2714,73786.5%2.0%
Period 5 of 2026-2714,51085.0%3.8%
Period 4 of 2026-2714,68285.5%2.5%
Period 3 of 2026-2714,44487.9%2.0%
Period 2 of 2026-2714,88688.8%3.5%
Period 1 of 2026-2717,21989.6%2.1%
Period 13 of 2025-2616,27891.0%1.4%
Period 12 of 2025-2614,53491.0%1.0%
Period 11 of 2025-2614,55191.0%1.8%
Period 10 of 2025-2613,20685.7%2.3%
Period 9 of 2025-2614,89281.2%2.8%
Period 8 of 2025-2615,31484.3%1.6%

Time of year

70%75%80%85%90%P1: 85.0%1P2: 83.8%2P3: 82.5%3P4: 81.9%4P5: 83.4%5P6: 84.3%6P7: 82.6%7P8: 79.6%8P9: 75.3%9P10: 81.5%10P11: 85.1%11P12: 85.8%12P13: 86.0%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Cardiff Central

OperatorScheduled stopsWithin 3 minCancelled
Great Western Railway41,69167.7%3.9%
CrossCountry10,46874.6%17.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out