Butlers Lane
BULWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Butlers Lane had 25,269 scheduled stops to Period 7 of 2026-27, about 69 a day. 83.0% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Butlers Lane opened on 30 September 1957, 69 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Butlers Lane is the newest; the oldest, Sutton Coldfield, opened in 1862.
The nearest stations to Butlers Lane are Blake Street (1.4 km north), Four Oaks (1.6 km south-east), Sutton Coldfield (3.2 km south), Shenstone (5.2 km north) and Wylde Green (5.2 km south). 13 stations lie within 10 km in all. Of the five, Sutton Coldfield is the most punctual at 84.8% and Four Oaks the least at 82.7%, with Butlers Lane on 83.0%.
Across the whole run of data, the weakest four-week period for Butlers Lane was Period 9 of 2024-25, at 73.7%, some time before the latest year. The strongest was Period 13 of 2024-25, at 91.9%, and the two are 18.2 percentage points apart. Cancellations peaked at 8.6% of scheduled stops in Period 11 of 2025-26, against 2.3% over the latest 13 periods.
Compared with 3 stations of a similar size in West Midlands, Butlers Lane is the least punctual, at 83.0%. All of them are ahead, including Blake Street (84.6%), Shenstone (84.6%) and Redditch (83.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 25,269 | 83.0% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Butlers Lane? Delay Repay
These operators call at Butlers Lane and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,960 | 80.9% | 1.6% |
| Period 6 of 2026-27 | 1,960 | 80.8% | 2.3% |
| Period 5 of 2026-27 | 1,960 | 83.8% | 2.2% |
| Period 4 of 2026-27 | 1,903 | 78.2% | 4.6% |
| Period 3 of 2026-27 | 1,709 | 83.7% | 1.5% |
| Period 2 of 2026-27 | 1,783 | 83.0% | 2.0% |
| Period 1 of 2026-27 | 2,248 | 84.7% | 1.0% |
| Period 13 of 2025-26 | 2,161 | 86.3% | 2.1% |
| Period 12 of 2025-26 | 1,960 | 87.0% | 1.2% |
| Period 11 of 2025-26 | 1,931 | 87.9% | 8.6% |
| Period 10 of 2025-26 | 1,774 | 83.4% | 1.4% |
| Period 9 of 2025-26 | 1,960 | 78.2% | 1.3% |
| Period 8 of 2025-26 | 1,960 | 80.4% | 0.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Blake Street | 25,269 | 84.6% | 2.3% |
| Shenstone | 25,269 | 84.6% | 2.3% |
| Redditch | 25,254 | 83.9% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out