Blake Street
BKTWest MidlandsManaged by West Midlands Trains (West Midlands Railway)
How this station is performing
Blake Street had 25,269 scheduled stops to Period 7 of 2026-27, about 69 a day. 84.6% of recorded arrivals were within three minutes of the timetable and 2.3% of scheduled stops were cancelled.
Blake Street opened on 15 December 1884, 142 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Sutton Coldfield is the oldest (1862) and Butlers Lane the newest (1957), with Blake Street in between.
The nearest stations to Blake Street are Butlers Lane (1.4 km south), Four Oaks (3.0 km south), Shenstone (3.8 km north), Sutton Coldfield (4.6 km south) and Wylde Green (6.6 km south). 12 stations lie within 10 km in all. Of the five, Sutton Coldfield is the most punctual at 84.8% and Four Oaks the least at 82.7%, with Blake Street on 84.6%.
Across the whole run of data, the weakest four-week period for Blake Street was Period 9 of 2024-25, at 72.0%, some time before the latest year. The strongest was Period 13 of 2024-25, at 91.9%, and the two are 19.9 percentage points apart. Cancellations peaked at 8.8% of scheduled stops in Period 11 of 2025-26, against 2.3% over the latest 13 periods.
Compared with 3 stations of a similar size in West Midlands, Blake Street is the most punctual, at 84.6%. The comparison group includes Butlers Lane (83.0%), Shenstone (84.6%) and Redditch (83.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 25,269 | 84.6% | 2.3% |
Operators with their own page for this station are linked to it.
Late train at Blake Street? Delay Repay
These operators call at Blake Street and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,960 | 82.8% | 1.6% |
| Period 6 of 2026-27 | 1,960 | 82.4% | 2.3% |
| Period 5 of 2026-27 | 1,960 | 86.0% | 2.2% |
| Period 4 of 2026-27 | 1,903 | 80.0% | 4.6% |
| Period 3 of 2026-27 | 1,709 | 84.8% | 1.5% |
| Period 2 of 2026-27 | 1,783 | 83.7% | 2.1% |
| Period 1 of 2026-27 | 2,248 | 86.5% | 1.0% |
| Period 13 of 2025-26 | 2,161 | 87.6% | 2.1% |
| Period 12 of 2025-26 | 1,960 | 88.2% | 1.2% |
| Period 11 of 2025-26 | 1,931 | 89.3% | 8.8% |
| Period 10 of 2025-26 | 1,774 | 85.0% | 1.4% |
| Period 9 of 2025-26 | 1,960 | 80.6% | 1.3% |
| Period 8 of 2025-26 | 1,960 | 82.9% | 0.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Butlers Lane | 25,269 | 83.0% | 2.3% |
| Shenstone | 25,269 | 84.6% | 2.3% |
| Redditch | 25,254 | 83.9% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out