ScotRail at Burntisland
How this operator is doing here
ScotRail had 23,955 scheduled stops at Burntisland in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 79.0% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
ScotRail trains at Burntisland also serve Kinghorn (3.9 km east, 77.6% on time, 1.7% cancelled), Aberdour (4.2 km west, 80.1% on time, 1.7% cancelled), Kirkcaldy (7.4 km north-east, 79.8% on time, 1.4% cancelled), Dalgety Bay (8.5 km west, 79.2% on time, 1.7% cancelled), Cowdenbeath (9.1 km north-west, 83.3% on time, 1.6% cancelled) and Cardenden (9.5 km north, 81.7% on time, 1.5% cancelled), which are the stations on its network closest to Burntisland.
Within 30 km of here, ScotRail runs best at Linlithgow, 24.3 km west (92.4%), and worst at Kinghorn, 3.9 km east (77.6%).
The busiest ScotRail station within 30 km of Burntisland is Edinburgh, 12.0 km south, with about 614 scheduled stops a day.
Of the 1 operators with enough records at Burntisland, ScotRail is the most punctual, at 79.0%.
ScotRail at Burntisland has slipped a little, from 83.2% within three minutes in the previous 13 periods to 79.0% in the latest 13, a fall of 4.2 percentage points. Cancellations held steady at 1.7% of scheduled stops, against 1.7% before.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,322 | 81.5% | 1.1% |
| Period 6 of 2026-27 | 1,859 | 79.0% | 2.3% |
| Period 5 of 2026-27 | 1,862 | 72.7% | 2.0% |
| Period 4 of 2026-27 | 1,858 | 74.2% | 2.4% |
| Period 3 of 2026-27 | 1,857 | 79.4% | 1.1% |
| Period 2 of 2026-27 | 1,856 | 81.7% | 1.7% |
| Period 1 of 2026-27 | 2,145 | 81.6% | 1.6% |
| Period 13 of 2025-26 | 2,031 | 83.7% | 0.6% |
| Period 12 of 2025-26 | 1,856 | 81.1% | 1.5% |
| Period 11 of 2025-26 | 1,906 | 84.7% | 1.9% |
| Period 10 of 2025-26 | 1,627 | 77.9% | 1.2% |
| Period 9 of 2025-26 | 1,888 | 73.4% | 3.1% |
| Period 8 of 2025-26 | 1,888 | 76.2% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out