Northern at Buckshaw Parkway
All trains at Buckshaw ParkwayNorthern across BritainNorth West
How this operator is doing here
Northern had 24,410 scheduled stops at Buckshaw Parkway in the 13 periods to Period 7 of 2026-27, 99% of the station's total. 59.6% of recorded arrivals came within three minutes and 4.8% of stops were cancelled.
Northern trains at Buckshaw Parkway also serve Euxton Balshaw Lane (1.7 km south-west, 84.2% on time, 2.9% cancelled), Chorley (3.1 km south-east, 59.3% on time, 4.6% cancelled), Leyland (3.4 km north-west, 75.9% on time, 4.2% cancelled), Bamber Bridge (6.0 km north, 83.6% on time, 3.0% cancelled), Lostock Hall (6.0 km north, 83.2% on time, 3.0% cancelled) and Adlington (Lancashire) (7.6 km south-east, 56.3% on time, 5.1% cancelled), which are the stations on its network closest to Buckshaw Parkway.
Within 30 km of here, Northern runs best at Thatto Heath, 27.1 km south (90.7%), and worst at Moses Gate, 21.4 km south-east (52.6%).
The busiest Northern station within 30 km of Buckshaw Parkway is Preston (Lancs), 9.7 km north, with about 260 scheduled stops a day.
Of the 2 operators with enough records at Buckshaw Parkway, Northern is the least punctual, at 59.6%.
Over three full railway years Northern at Buckshaw Parkway has got worse each time, from 68.8% within three minutes in 2023-24 to 65.9% in 2024-25 and 59.6% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,852 | 59.7% | 4.8% |
| Period 6 of 2026-27 | 1,852 | 62.6% | 3.7% |
| Period 5 of 2026-27 | 1,873 | 60.7% | 5.9% |
| Period 4 of 2026-27 | 1,851 | 58.1% | 4.9% |
| Period 3 of 2026-27 | 1,848 | 57.7% | 6.0% |
| Period 2 of 2026-27 | 1,868 | 63.4% | 3.6% |
| Period 1 of 2026-27 | 2,139 | 63.3% | 3.5% |
| Period 13 of 2025-26 | 2,036 | 61.3% | 9.6% |
| Period 12 of 2025-26 | 1,867 | 64.3% | 2.7% |
| Period 11 of 2025-26 | 1,838 | 64.3% | 2.6% |
| Period 10 of 2025-26 | 1,670 | 58.6% | 7.5% |
| Period 9 of 2025-26 | 1,868 | 46.8% | 5.1% |
| Period 8 of 2025-26 | 1,848 | 53.4% | 2.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Buckshaw Parkway
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 125 | 90.2% | 4.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out