How this station is performing
Burnley Manchester Road had 24,282 scheduled stops to Period 7 of 2026-27, about 67 a day. 71.5% of recorded arrivals were within three minutes of the timetable and 3.2% of scheduled stops were cancelled.
Burnley Manchester Road opened on 13 October 1986, 40 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Burnley Manchester Road is the newest; the oldest, Burnley Barracks, opened in 1848.
The nearest stations to Burnley Manchester Road are Burnley Barracks (0.9 km north-west), Burnley Central (1.0 km north), Rose Grove (2.2 km west), Brierfield (4.5 km north) and Hapton (4.5 km west). 9 stations lie within 10 km in all. At 71.5%, Burnley Manchester Road is less punctual than all of them; the best of the five, Burnley Central, manages 82.8%.
Burnley Manchester Road is named after Burnley, a market town, home to about 82,002 people, but the station stands 0.4 km from its centre.
For Burnley Manchester Road, the weakest four-week period in the data is a recent one: Period 9 of 2025-26, when only 55.9% of stops arrived within three minutes of the timetable. The strongest was Period 1 of 2023-24, at 85.1%, which is 29.2 percentage points higher. Cancellations peaked at 12.9% of scheduled stops in Period 4 of 2024-25, against 3.2% over the latest 13 periods.
1 of 3 stations of a similar size in North West are more punctual than Burnley Manchester Road on 71.5%. The comparison group includes Urmston (60.9%), Buckshaw Parkway (59.8%) and Hazel Grove (85.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 24,282 | 71.5% | 3.2% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,892 | 71.5% | 2.2% |
| Period 6 of 2026-27 | 1,867 | 77.8% | 2.6% |
| Period 5 of 2026-27 | 1,816 | 75.4% | 3.5% |
| Period 4 of 2026-27 | 1,819 | 71.9% | 3.6% |
| Period 3 of 2026-27 | 1,758 | 72.7% | 3.2% |
| Period 2 of 2026-27 | 1,892 | 67.6% | 3.6% |
| Period 1 of 2026-27 | 2,174 | 78.0% | 3.4% |
| Period 13 of 2025-26 | 2,069 | 75.7% | 2.6% |
| Period 12 of 2025-26 | 1,888 | 70.1% | 1.8% |
| Period 11 of 2025-26 | 1,888 | 73.7% | 1.5% |
| Period 10 of 2025-26 | 1,730 | 74.6% | 5.8% |
| Period 9 of 2025-26 | 1,735 | 55.9% | 4.8% |
| Period 8 of 2025-26 | 1,754 | 61.0% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Urmston | 24,128 | 60.9% | 4.9% |
| Buckshaw Parkway | 24,535 | 59.8% | 4.8% |
| Hazel Grove | 23,895 | 85.1% | 2.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out