Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Broughty Ferry

BYFScotlandManaged by ScotRail

On time, last 13 periods76.6%Great Britain: 83.6%
Cancelled2.1%Great Britain: 3.2%
Stops a day34Scheduled, on average
Punctuality rankNot rankedAmong ranked stations

How this station is performing

Broughty Ferry has usable figures for 6 of the last 13 four-week periods to Period 7 of 2026-27, covering 12,510 scheduled stops, about 34 a day. In those periods 76.6% of stops arrived within three minutes of the timetable and 2.1% of scheduled stops were cancelled.

Broughty Ferry opened on 8 October 1838, 188 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Broughty Ferry is the oldest; the next oldest, Monifieth, dates from 1838.

The nearest stations to Broughty Ferry are Balmossie (2.3 km east), Monifieth (3.7 km east), Dundee (6.1 km west), Barry Links (8.4 km east) and Golf Street (10.1 km east). 4 stations lie within 10 km in all.

Broughty Ferry takes its name from a suburb called Broughty Ferry, home to about 18,659 people, and the station stands 0.3 km from its centre.

For Broughty Ferry, the weakest four-week period in the data is a recent one: Period 7 of 2026-27, when only 71.5% of stops arrived within three minutes of the timetable. The strongest was Period 3 of 2026-27, at 80.3%, which is 8.8 percentage points higher. Cancellations peaked at 11.7% of scheduled stops in Period 8 of 2023-24, against 2.1% over the latest 13 periods.

ScotRail is the only operator serving Broughty Ferry. Here it manages 76.6% within three minutes, 11.3 percentage points worse than its 87.9% across its whole network.

Period by period

70%80%90%2023-242024-252025-262026-27Period 2 of 2026-27: 78.1%Period 3 of 2026-27: 80.3%Period 4 of 2026-27: 78.1%Period 5 of 2026-27: 72.3%Period 6 of 2026-27: 79.7%Period 7 of 2026-27: 71.5%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 2.8%Period 2 of 2023-24: 3.2%Period 3 of 2023-24: 8.1%Period 4 of 2023-24: 4.2%Period 5 of 2023-24: 5.6%Period 6 of 2023-24: 6.9%Period 7 of 2023-24: 4.2%Period 8 of 2023-24: 11.7%Period 9 of 2023-24: 6.1%Period 10 of 2023-24: 4.6%Period 11 of 2023-24: 6.2%Period 12 of 2023-24: 1.6%Period 13 of 2023-24: 2.9%Period 1 of 2024-25: 2.6%Period 2 of 2024-25: 2.2%Period 3 of 2024-25: 1.3%Period 4 of 2024-25: 4.2%Period 5 of 2024-25: 2.6%Period 6 of 2024-25: 2.4%Period 7 of 2024-25: 2.0%Period 8 of 2024-25: 3.9%Period 9 of 2024-25: 7.5%Period 10 of 2024-25: 1.1%Period 11 of 2024-25: 3.4%Period 12 of 2024-25: 2.2%Period 13 of 2024-25: 2.1%Period 1 of 2025-26: 1.4%Period 2 of 2025-26: 1.3%Period 3 of 2025-26: 2.3%Period 4 of 2025-26: 1.7%Period 5 of 2025-26: 2.7%Period 6 of 2025-26: 2.0%Period 7 of 2025-26: 5.8%Period 8 of 2025-26: 1.6%Period 9 of 2025-26: 3.9%Period 10 of 2025-26: 3.5%Period 11 of 2025-26: 1.7%Period 12 of 2025-26: 1.6%Period 13 of 2025-26: 1.7%Period 1 of 2026-27: 2.4%Period 2 of 2026-27: 1.9%Period 3 of 2026-27: 1.7%Period 4 of 2026-27: 2.7%Period 5 of 2026-27: 2.6%Period 6 of 2026-27: 0.9%Period 7 of 2026-27: 0.7%2023-242024-252025-262026-27

Operators calling here

OperatorScheduled stopsWithin 3 minCancelled
ScotRail12,51076.6%2.1%

Operators with their own page for this station are linked to it.

Late train at Broughty Ferry? Delay Repay

These operators call at Broughty Ferry and publish Delay Repay rules.

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2796471.5%0.7%
Period 6 of 2026-2796579.7%0.9%
Period 5 of 2026-2796472.3%2.6%
Period 4 of 2026-2796478.1%2.7%
Period 3 of 2026-2796480.3%1.7%
Period 2 of 2026-2796478.1%1.9%
Period 1 of 2026-271,119–2.4%
Period 13 of 2025-261,049–1.7%
Period 12 of 2025-26890–1.6%
Period 11 of 2025-26905–1.7%
Period 10 of 2025-26835–3.5%
Period 9 of 2025-26963–3.9%
Period 8 of 2025-26964–1.6%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out