GTR at Brockley
How this operator is doing here
GTR had 26,869 scheduled stops at Brockley in the 13 periods to Period 7 of 2026-27, 21% of the station's total. 94.1% of recorded arrivals came within three minutes and 3.7% of stops were cancelled.
GTR trains at Brockley also serve Crofton Park (1.1 km south, 92.0% on time, 4.1% cancelled), Nunhead (1.1 km west, 85.6% on time, 4.2% cancelled), New Cross Gate (1.2 km north, 92.9% on time, 3.7% cancelled), Honor Oak Park (1.6 km south, 91.8% on time, 3.7% cancelled), Lewisham (1.6 km east, 90.9% on time, 1.0% cancelled) and Queens Road (Peckham) (1.8 km north-west, 94.8% on time, 2.5% cancelled), which are the stations on its network closest to Brockley.
Within 30 km of here, GTR runs best at Beckenham Junction, 6.0 km south (98.1%), and worst at Kenley, 16.1 km south (66.9%).
The busiest GTR station within 30 km of Brockley is East Croydon, 10.6 km south, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Brockley, GTR is the most punctual, at 94.1%.
For GTR, Brockley is the 10th best of 307 ranked stations. Its 94.1% here is 11.2 percentage points above the 82.9% across the whole network.
GTR at Brockley has slipped a little, from 95.8% within three minutes in the previous 13 periods to 94.1% in the latest 13, a fall of 1.7 percentage points. Cancellations rose to 3.7% of scheduled stops from 1.8%, which is 1.9 percentage points more.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,084 | 92.7% | 6.8% |
| Period 6 of 2026-27 | 2,045 | 88.3% | 2.2% |
| Period 5 of 2026-27 | 2,045 | 90.5% | 4.9% |
| Period 4 of 2026-27 | 2,207 | 94.8% | 3.0% |
| Period 3 of 2026-27 | 2,124 | 94.0% | 2.3% |
| Period 2 of 2026-27 | 1,994 | 96.0% | 3.2% |
| Period 1 of 2026-27 | 2,317 | 95.7% | 4.6% |
| Period 13 of 2025-26 | 2,317 | 95.9% | 3.2% |
| Period 12 of 2025-26 | 2,021 | 95.6% | 4.3% |
| Period 11 of 2025-26 | 1,801 | 94.4% | 3.1% |
| Period 10 of 2025-26 | 1,960 | 95.2% | 2.6% |
| Period 9 of 2025-26 | 1,977 | 95.0% | 1.6% |
| Period 8 of 2025-26 | 1,977 | 95.4% | 6.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Brockley
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| London Overground | 103,371 | 92.1% | 3.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out