Bowling
BWGScotlandManaged by ScotRail
How this station is performing
Bowling had 23,671 scheduled stops to Period 7 of 2026-27, about 65 a day. 82.3% of recorded arrivals were within three minutes of the timetable and 1.9% of scheduled stops were cancelled.
Bowling opened on 31 May 1858, 168 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Bishopton (Renfrewshire) is the oldest (1841) and Dumbarton East the newest (1896), with Bowling in between.
The nearest stations to Bowling are Kilpatrick (2.6 km east), Bishopton (Renfrewshire) (3.2 km south), Dumbarton East (4.0 km west), Dalmuir (4.6 km south-east) and Dumbarton Central (4.9 km west). 17 stations lie within 10 km in all. Of the five, Bishopton (Renfrewshire) is the most punctual at 96.2% and Dumbarton Central the least at 82.2%, with Bowling on 82.3%.
Bowling is one of 4 stations named after a Village called Bowling, home to about 560 people; this one stands 0.5 km from its centre.
Across the whole run of data, the weakest four-week period for Bowling was Period 8 of 2024-25, at 65.0%, some time before the latest year. The strongest was Period 4 of 2023-24, at 87.9%, and the two are 22.9 percentage points apart.
2 of 3 stations of a similar size in Scotland are more punctual than Bowling on 82.3%. The comparison group includes Kilpatrick (83.3%), Bogston (95.9%) and Leuchars (For St. Andrews) (74.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 23,671 | 82.3% | 1.9% |
Operators with their own page for this station are linked to it.
Late train at Bowling? Delay Repay
These operators call at Bowling and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,817 | 81.1% | 2.6% |
| Period 6 of 2026-27 | 1,832 | 85.2% | 0.8% |
| Period 5 of 2026-27 | 1,832 | 85.7% | 1.9% |
| Period 4 of 2026-27 | 1,832 | 85.0% | 2.5% |
| Period 3 of 2026-27 | 1,832 | 87.2% | 0.8% |
| Period 2 of 2026-27 | 1,832 | 83.5% | 0.9% |
| Period 1 of 2026-27 | 2,096 | 85.5% | 1.0% |
| Period 13 of 2025-26 | 2,026 | 85.5% | 1.1% |
| Period 12 of 2025-26 | 1,832 | 82.7% | 1.3% |
| Period 11 of 2025-26 | 1,832 | 83.3% | 1.1% |
| Period 10 of 2025-26 | 1,284 | 75.9% | 3.6% |
| Period 9 of 2025-26 | 1,812 | 73.5% | 4.0% |
| Period 8 of 2025-26 | 1,812 | 72.7% | 3.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Kilpatrick | 23,731 | 83.3% | 1.9% |
| Bogston | 23,534 | 95.9% | 1.2% |
| Leuchars (For St. Andrews) | 23,503 | 74.1% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out