Bow Street
BOWWalesManaged by TfW Rail
How this station is performing
Bow Street has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 10,760 scheduled stops, about 30 a day. In those periods 75.3% of stops arrived within three minutes of the timetable and 5.2% of scheduled stops were cancelled.
Bow Street opened on 23 June 1864 and closed to passengers on 14 June 1965. It reopened on 14 February 2021, 5 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Borth is the oldest (1863) and Penhelig the newest (1933), with Bow Street in between.
The nearest stations to Bow Street are Aberystwyth (4.5 km south-west), Borth (5.8 km north), Aberdovey (11.7 km north), Penhelig (11.8 km north) and Dovey Junction (15.6 km north-east). 2 stations lie within 10 km in all. Of the five, Borth is the most punctual at 81.7% and Penhelig the least at 68.4%, with Bow Street on 75.3%.
Bow Street takes its name from a Village called Bow Street, home to about 1,901 people, and the station stands 0.3 km from its centre.
2 of 3 stations of a similar size in Wales are more punctual than Bow Street on 75.3%. The comparison group includes Borth (81.7%), Aberystwyth (77.8%) and Pyle (64.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 10,760 | 75.3% | 5.2% |
Operators with their own page for this station are linked to it.
Late train at Bow Street? Delay Repay
These operators call at Bow Street and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 843 | 79.2% | 5.1% |
| Period 6 of 2026-27 | 873 | 64.3% | 4.8% |
| Period 5 of 2026-27 | 829 | 57.2% | 7.1% |
| Period 4 of 2026-27 | 674 | – | 8.2% |
| Period 3 of 2026-27 | 817 | 79.2% | 4.8% |
| Period 2 of 2026-27 | 567 | 74.9% | 12.3% |
| Period 1 of 2026-27 | 982 | 78.2% | 2.6% |
| Period 13 of 2025-26 | 968 | 85.5% | 1.7% |
| Period 12 of 2025-26 | 856 | 83.3% | 2.8% |
| Period 11 of 2025-26 | 832 | 83.6% | 6.3% |
| Period 10 of 2025-26 | 799 | 77.5% | 7.5% |
| Period 9 of 2025-26 | 867 | 74.6% | 4.7% |
| Period 8 of 2025-26 | 853 | 63.1% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Borth | 10,760 | 81.7% | 5.2% |
| Aberystwyth | 10,932 | 77.8% | 5.5% |
| Pyle | 11,432 | 64.0% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out