Pyle
PYLWalesManaged by TfW Rail
How this station is performing
Pyle had 11,432 scheduled stops to Period 7 of 2026-27, about 31 a day. 64.0% of recorded arrivals were within three minutes of the timetable and 2.6% of scheduled stops were cancelled.
Pyle opened on 23 August 1865 and closed to passengers on 9 September 1963. It reopened on 27 June 1994, 32 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Bridgend is the oldest (1850) and Garth (Bridgend County) the newest (1992), with Pyle in between.
The nearest stations to Pyle are Tondu (7.5 km east), Sarn (7.6 km east), Wildmill (8.1 km east), Bridgend (8.7 km east) and Garth (Bridgend County) (8.8 km north-east). 8 stations lie within 10 km in all. At 64.0%, Pyle is less punctual than all of them; the best of the five, Wildmill, manages 74.2%.
Pyle is one of 2 stations named after a Village called Pyle, home to about 7,405 people; this one stands 0.5 km from its centre.
Compared with 3 stations of a similar size in Wales, Pyle is the least punctual, at 64.0%. All of them are ahead, including Garth (Bridgend County) (72.6%), Maesteg (Ewenny Road) (73.3%) and Sarn (71.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 11,432 | 64.0% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Pyle? Delay Repay
These operators call at Pyle and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 872 | 62.6% | 1.8% |
| Period 6 of 2026-27 | 883 | 60.5% | 2.3% |
| Period 5 of 2026-27 | 880 | 56.9% | 4.0% |
| Period 4 of 2026-27 | 898 | 60.9% | 5.6% |
| Period 3 of 2026-27 | 884 | 65.5% | 2.5% |
| Period 2 of 2026-27 | 881 | 65.6% | 2.4% |
| Period 1 of 2026-27 | 1,004 | 69.8% | 2.4% |
| Period 13 of 2025-26 | 944 | 73.5% | 1.3% |
| Period 12 of 2025-26 | 814 | 73.3% | 1.7% |
| Period 11 of 2025-26 | 806 | 77.6% | 2.0% |
| Period 10 of 2025-26 | 814 | 59.2% | 2.2% |
| Period 9 of 2025-26 | 882 | 48.9% | 2.8% |
| Period 8 of 2025-26 | 870 | 57.3% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Garth (Bridgend County) | 11,503 | 72.6% | 3.0% |
| Maesteg (Ewenny Road) | 11,503 | 73.3% | 3.0% |
| Sarn | 11,503 | 71.5% | 1.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out