Aberystwyth
AYWWalesManaged by TfW Rail
How this station is performing
Aberystwyth had 10,932 scheduled stops to Period 7 of 2026-27, about 30 a day. 77.8% of recorded arrivals were within three minutes of the timetable and 5.5% of scheduled stops were cancelled.
Aberystwyth opened on 23 June 1864, 162 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Borth is the oldest (1863) and Penhelig the newest (1933), with Aberystwyth in between.
The nearest stations to Aberystwyth are Bow Street (4.5 km north-east), Borth (8.8 km north), Aberdovey (14.6 km north), Penhelig (15.0 km north) and Tywyn (19.1 km north). 2 stations lie within 10 km in all. Of the five, Tywyn is the most punctual at 83.2% and Penhelig the least at 68.4%, with Aberystwyth on 77.8%.
Aberystwyth takes its name from a college town called Aberystwyth, home to about 13,040 people, and the station stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Aberystwyth was Period 8 of 2023-24, at 54.9%, some time before the latest year. The strongest was Period 12 of 2024-25, at 91.3%, and the two are 36.4 percentage points apart. Cancellations peaked at 13.2% of scheduled stops in Period 9 of 2024-25, against 5.5% over the latest 13 periods.
1 of 3 stations of a similar size in Wales are more punctual than Aberystwyth on 77.8%. The comparison group includes Borth (81.7%), Bow Street (75.3%) and Pyle (64.0%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 10,932 | 77.8% | 5.5% |
Operators with their own page for this station are linked to it.
Late train at Aberystwyth? Delay Repay
These operators call at Aberystwyth and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 843 | 83.5% | 5.1% |
| Period 6 of 2026-27 | 874 | 68.3% | 4.8% |
| Period 5 of 2026-27 | 855 | 57.3% | 8.8% |
| Period 4 of 2026-27 | 751 | 62.5% | 9.9% |
| Period 3 of 2026-27 | 885 | 80.8% | 5.8% |
| Period 2 of 2026-27 | 567 | 74.4% | 12.3% |
| Period 1 of 2026-27 | 982 | 84.6% | 2.6% |
| Period 13 of 2025-26 | 968 | 91.1% | 1.7% |
| Period 12 of 2025-26 | 856 | 86.9% | 2.8% |
| Period 11 of 2025-26 | 832 | 86.4% | 6.3% |
| Period 10 of 2025-26 | 799 | 82.1% | 7.5% |
| Period 9 of 2025-26 | 867 | 78.0% | 4.7% |
| Period 8 of 2025-26 | 853 | 68.8% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Borth | 10,760 | 81.7% | 5.2% |
| Bow Street | 10,760 | 75.3% | 5.2% |
| Pyle | 11,432 | 64.0% | 2.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out