Hillside
HILNorth WestManaged by Merseyrail
How this station is performing
Hillside had 49,129 scheduled stops to Period 7 of 2026-27, about 135 a day. 91.2% of recorded arrivals were within three minutes of the timetable and 1.3% of scheduled stops were cancelled.
Hillside opened on 1 May 1926, 100 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Hillside is the newest; the oldest, Birkdale, opened in 1848.
The nearest stations to Hillside are Birkdale (1.5 km north-east), Ainsdale (2.5 km south-west), Southport (3.2 km north-east), Meols Cop (4.3 km north-east) and Freshfield (6.8 km south-west). 7 stations lie within 10 km in all. Of the five, Birkdale is the most punctual at 92.8% and Meols Cop the least at 84.1%, with Hillside on 91.2%.
Hillside is one of 3 stations named after a neighborhood called Hillside; this one stands 0.1 km from its centre.
Across the whole run of data, the weakest four-week period for Hillside was Period 5 of 2024-25, at 83.1%, some time before the latest year. The strongest was Period 7 of 2024-25, at 97.2%, and the two are 14.1 percentage points apart.
2 of 3 stations of a similar size in North West are more punctual than Hillside on 91.2%. The comparison group includes Warrington Central (66.6%), Formby (93.4%) and Waterloo (Merseyside) (93.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Merseyrail | 49,129 | 91.2% | 1.3% |
Operators with their own page for this station are linked to it.
Late train at Hillside? Delay Repay
These operators call at Hillside and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,709 | 92.7% | 1.4% |
| Period 6 of 2026-27 | 3,788 | 92.7% | 0.9% |
| Period 5 of 2026-27 | 3,852 | 90.7% | 1.4% |
| Period 4 of 2026-27 | 3,774 | 88.1% | 1.4% |
| Period 3 of 2026-27 | 3,784 | 91.3% | 0.7% |
| Period 2 of 2026-27 | 3,710 | 90.8% | 1.2% |
| Period 1 of 2026-27 | 4,288 | 90.0% | 1.3% |
| Period 13 of 2025-26 | 4,060 | 89.6% | 1.3% |
| Period 12 of 2025-26 | 3,709 | 89.3% | 1.1% |
| Period 11 of 2025-26 | 3,715 | 89.4% | 1.1% |
| Period 10 of 2025-26 | 3,316 | 94.1% | 1.6% |
| Period 9 of 2025-26 | 3,705 | 94.3% | 1.1% |
| Period 8 of 2025-26 | 3,719 | 93.3% | 2.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in North West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Warrington Central | 49,194 | 66.6% | 4.6% |
| Formby | 49,015 | 93.4% | 1.2% |
| Waterloo (Merseyside) | 49,015 | 93.1% | 1.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out