How this operator is doing here
Avanti had 884 scheduled stops at Blackpool North in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 79.7% of recorded arrivals came within three minutes and 10.5% of stops were cancelled.
Avanti trains at Blackpool North also serve Poulton-le-Fylde (4.7 km north-east, – on time, – cancelled), Kirkham and Wesham (11.6 km east, – on time, – cancelled), Preston (Lancs) (23.6 km east, 52.1% on time, 4.0% cancelled), Lancaster (29.6 km north-east, 42.1% on time, 4.6% cancelled), Blackburn (38.4 km east, – on time, – cancelled) and Wigan North Western (41.4 km south-east, 46.5% on time, 3.9% cancelled), which are the stations on its network closest to Blackpool North.
The busiest Avanti station within 30 km of Blackpool North is Preston (Lancs), 23.6 km east, with about 62 scheduled stops a day.
Of the 2 operators with enough records at Blackpool North, Avanti is the least punctual, at 79.7%.
Avanti at Blackpool North has edged up: 79.7% of stops came within three minutes of the timetable in the latest 13 periods, 2.7 percentage points better than the 77.0% of the 13 before. Cancellations rose to 10.5% of scheduled stops from 7.4%, which is 3.1 percentage points more.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 45 | – | – |
| Period 6 of 2026-27 | 49 | – | – |
| Period 5 of 2026-27 | 49 | – | – |
| Period 4 of 2026-27 | 51 | – | – |
| Period 3 of 2026-27 | 42 | – | – |
| Period 2 of 2026-27 | 61 | 84.3% | 16.4% |
| Period 1 of 2026-27 | 108 | 78.8% | 8.3% |
| Period 13 of 2025-26 | 69 | 90.2% | 11.6% |
| Period 12 of 2025-26 | 78 | 85.3% | 12.8% |
| Period 11 of 2025-26 | 79 | 77.9% | 2.5% |
| Period 10 of 2025-26 | 48 | – | – |
| Period 9 of 2025-26 | 103 | 81.2% | 17.5% |
| Period 8 of 2025-26 | 102 | 67.7% | 5.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Blackpool North
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 48,772 | 82.3% | 4.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out