GTR at Biggleswade
How this operator is doing here
GTR had 29,543 scheduled stops at Biggleswade in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 84.4% of recorded arrivals came within three minutes and 6.0% of stops were cancelled.
GTR trains at Biggleswade also serve Sandy (4.6 km north, 84.9% on time, 6.0% cancelled), Arlesey (6.6 km south, 85.6% on time, 6.3% cancelled), Baldock (11.4 km south-east, 72.9% on time, 8.7% cancelled), Letchworth Garden City (11.8 km south, 72.5% on time, 8.3% cancelled), Ashwell and Morden (12.0 km south-east, 72.8% on time, 9.6% cancelled) and Hitchin (14.7 km south, 77.3% on time, 6.9% cancelled), which are the stations on its network closest to Biggleswade.
Within 30 km of here, GTR runs best at Watton-At-Stone, 27.2 km south (90.4%), and worst at Foxton, 22.0 km east (66.8%).
The busiest GTR station within 30 km of Biggleswade is Stevenage, 20.7 km south, with about 285 scheduled stops a day.
Of the 1 operators with enough records at Biggleswade, GTR is the most punctual, at 84.4%.
For GTR, Biggleswade is the 140th best of 307 ranked stations. Its 84.4% here is 1.5 percentage points above the 82.9% across the whole network.
Over three full railway years GTR at Biggleswade has improved each time, from 81.3% within three minutes in 2023-24 to 82.2% in 2024-25 and 84.7% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,307 | 82.2% | 4.7% |
| Period 6 of 2026-27 | 2,236 | 79.7% | 9.1% |
| Period 5 of 2026-27 | 2,290 | 80.3% | 9.0% |
| Period 4 of 2026-27 | 2,307 | 80.4% | 8.7% |
| Period 3 of 2026-27 | 2,304 | 83.1% | 7.3% |
| Period 2 of 2026-27 | 2,305 | 87.1% | 6.1% |
| Period 1 of 2026-27 | 2,663 | 88.3% | 5.4% |
| Period 13 of 2025-26 | 2,478 | 89.3% | 2.3% |
| Period 12 of 2025-26 | 1,964 | 85.6% | 3.0% |
| Period 11 of 2025-26 | 2,163 | 84.8% | 4.1% |
| Period 10 of 2025-26 | 2,048 | 86.2% | 4.7% |
| Period 9 of 2025-26 | 2,177 | 82.6% | 9.0% |
| Period 8 of 2025-26 | 2,301 | 86.0% | 4.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Biggleswade
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Grand Central | 2 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out