Biggleswade
BIWEast of EnglandManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Biggleswade had 29,545 scheduled stops to Period 7 of 2026-27, about 81 a day. 84.4% of recorded arrivals were within three minutes of the timetable and 6.0% of scheduled stops were cancelled.
Biggleswade opened on 7 August 1850, 176 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Biggleswade is the oldest; the next oldest, Sandy, dates from 1850.
The nearest stations to Biggleswade are Sandy (4.6 km north), Arlesey (6.6 km south), Baldock (11.4 km south-east), Letchworth Garden City (11.8 km south) and Ashwell and Morden (12.0 km south-east). 2 stations lie within 10 km in all. Of the five, Arlesey is the most punctual at 85.6% and Letchworth Garden City the least at 72.5%, with Biggleswade on 84.4%.
Biggleswade takes its name from a market town called Biggleswade, home to about 22,541 people, and the station stands 0.4 km from its centre.
Cancellations are a particular problem at Biggleswade. 6.0% of scheduled stops did not happen, 2.2 times the national median of 2.7%. Ranked from fewest cancellations to most, the station is 2244th of 2,374.
1 of 3 stations of a similar size in East of England are more punctual than Biggleswade on 84.4%. The comparison group includes Huntingdon (79.9%), St Neots (82.3%) and Thorpe-le-Soken (95.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 29,543 | 84.4% | 6.0% |
| Grand Central | 2 | – | – |
Operators with their own page for this station are linked to it.
Late train at Biggleswade? Delay Repay
These operators call at Biggleswade and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,307 | 82.2% | 4.7% |
| Period 6 of 2026-27 | 2,236 | 79.7% | 9.1% |
| Period 5 of 2026-27 | 2,291 | 80.3% | 9.0% |
| Period 4 of 2026-27 | 2,307 | 80.4% | 8.7% |
| Period 3 of 2026-27 | 2,305 | 83.1% | 7.3% |
| Period 2 of 2026-27 | 2,305 | 87.1% | 6.1% |
| Period 1 of 2026-27 | 2,663 | 88.3% | 5.4% |
| Period 13 of 2025-26 | 2,478 | 89.3% | 2.3% |
| Period 12 of 2025-26 | 1,964 | 85.6% | 3.0% |
| Period 11 of 2025-26 | 2,163 | 84.8% | 4.1% |
| Period 10 of 2025-26 | 2,048 | 86.2% | 4.7% |
| Period 9 of 2025-26 | 2,177 | 82.6% | 9.0% |
| Period 8 of 2025-26 | 2,301 | 86.0% | 4.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Huntingdon | 29,516 | 79.9% | 6.0% |
| St Neots | 29,625 | 82.3% | 5.9% |
| Thorpe-le-Soken | 29,428 | 95.5% | 0.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out