Southeastern at Bickley
How this operator is doing here
Southeastern had 44,555 scheduled stops at Bickley in the 13 periods to Period 7 of 2026-27, 57% of the station's total. 84.6% of recorded arrivals came within three minutes and 2.0% of stops were cancelled.
Southeastern trains at Bickley also serve Chislehurst (1.1 km north-east, 91.0% on time, 1.2% cancelled), Bromley South (1.8 km west, 80.6% on time, 1.6% cancelled), Elmstead Woods (1.8 km north, 90.8% on time, 1.2% cancelled), Bromley North (2.1 km north-west, 99.2% on time, 0.5% cancelled), Sundridge Park (2.2 km north-west, 99.4% on time, 0.5% cancelled) and Petts Wood (2.5 km south-east, 84.2% on time, 1.5% cancelled), which are the stations on its network closest to Bickley.
Within 30 km of here, Southeastern runs best at Sundridge Park, 2.2 km north-west (99.4%), and worst at Hildenborough, 24.3 km south-east (70.3%).
The busiest Southeastern station within 30 km of Bickley is London Bridge, 14.7 km north-west, with about 912 scheduled stops a day.
Of the 2 operators with enough records at Bickley, Southeastern is the least punctual, at 84.6%.
For Southeastern, Bickley ranks 73rd of 173 stations and is typical: 84.6% here against 84.2% across the network, a difference of 0.4 percentage points.
Cancellations of Southeastern at Bickley are near its usual level: 2.0% of scheduled stops, against 1.7% across its network and 2.6% for every operator at the station.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,585 | 85.6% | 1.2% |
| Period 6 of 2026-27 | 3,498 | 82.0% | 2.9% |
| Period 5 of 2026-27 | 2,534 | 77.5% | 2.7% |
| Period 4 of 2026-27 | 3,516 | 86.2% | 2.0% |
| Period 3 of 2026-27 | 3,528 | 83.6% | 2.6% |
| Period 2 of 2026-27 | 3,374 | 86.1% | 3.0% |
| Period 1 of 2026-27 | 3,956 | 90.5% | 1.0% |
| Period 13 of 2025-26 | 3,876 | 88.8% | 1.2% |
| Period 12 of 2025-26 | 3,516 | 87.8% | 1.1% |
| Period 11 of 2025-26 | 3,504 | 85.8% | 1.2% |
| Period 10 of 2025-26 | 2,687 | 81.8% | 4.1% |
| Period 9 of 2025-26 | 3,498 | 81.7% | 1.9% |
| Period 8 of 2025-26 | 3,483 | 78.4% | 2.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bickley
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 33,457 | 87.4% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out