GTR at Bickley
How this operator is doing here
GTR had 33,457 scheduled stops at Bickley in the 13 periods to Period 7 of 2026-27, 43% of the station's total. 87.4% of recorded arrivals came within three minutes and 3.4% of stops were cancelled.
GTR trains at Bickley also serve Bromley South (1.8 km west, 87.8% on time, 3.2% cancelled), Petts Wood (2.5 km south-east, 84.3% on time, 5.8% cancelled), Shortlands (3.0 km west, 89.8% on time, 3.6% cancelled), Ravensbourne (3.9 km north-west, 91.3% on time, 4.0% cancelled), St Mary Cray (4.3 km east, 91.1% on time, 3.0% cancelled) and Orpington (4.3 km south-east, 81.0% on time, 5.9% cancelled), which are the stations on its network closest to Bickley.
Within 30 km of here, GTR runs best at Beckenham Junction, 5.0 km west (98.1%), and worst at Kenley, 13.2 km south-west (66.9%).
The busiest GTR station within 30 km of Bickley is East Croydon, 9.9 km west, with about 813 scheduled stops a day.
Of the 2 operators with enough records at Bickley, GTR is the most punctual, at 87.4%.
For GTR, Bickley is the 95th best of 307 ranked stations. Its 87.4% here is 4.5 percentage points above the 82.9% across the whole network.
GTR at Bickley has not moved in one direction over three full railway years: 89.4% within three minutes in 2023-24, 87.6% in 2024-25 and 88.0% in 2025-26.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,628 | 84.3% | 2.1% |
| Period 6 of 2026-27 | 2,568 | 83.3% | 4.5% |
| Period 5 of 2026-27 | 2,628 | 86.8% | 3.2% |
| Period 4 of 2026-27 | 2,624 | 88.4% | 3.2% |
| Period 3 of 2026-27 | 2,431 | 88.0% | 4.3% |
| Period 2 of 2026-27 | 2,356 | 89.1% | 4.3% |
| Period 1 of 2026-27 | 2,881 | 92.1% | 1.0% |
| Period 13 of 2025-26 | 2,862 | 90.0% | 3.1% |
| Period 12 of 2025-26 | 2,560 | 89.4% | 2.7% |
| Period 11 of 2025-26 | 2,594 | 87.8% | 2.7% |
| Period 10 of 2025-26 | 2,138 | 88.2% | 5.7% |
| Period 9 of 2025-26 | 2,626 | 83.2% | 5.9% |
| Period 8 of 2025-26 | 2,561 | 84.5% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Bickley
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 44,555 | 84.6% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out